Violation Detail
Standard Cited: 5A0001 OSH Act General Duty Paragraph
Inspection Nr: 309341717
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $3,500.00
Current Penalty: $2,450.00
Issuance Date: 09/22/2008
Nr Instances: 6
Nr Exposed: 1
Abatement Date: 10/10/2008
Gravity: 10
Report ID: 0336000
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/01/2008 | $2,450.00 | 10/10/2008 | Serious | |
| Penalty | Z: Issued | 09/22/2008 | $3,500.00 | 10/10/2008 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: UNAPOPPROC
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to operating a drilling rig with improper rig stability configuration: a) Jones Unit 3, Woodcock Twp, Crawford Cnty, PA - On or about June 12, 2008 the right side forward crown guy wire was anchored to a twelve inch (12") maple tree. b) Jones Unit 3, Woodcock Twp, Crawford Cnty, PA - On or about June 12, 2008 the left side forward crown guy wire was anchored to a nineteen inch (19") diameter maple tree. c) Jones Unit 3, Woodcock Twp, Crawford Cnty, PA - On or about June 12, 2008 the right side rear crown guy wire was anchored to a sixteen inch (16") diameter maple tree. Also, the employer did not ensure a "chain-around" system bypassed the come-a-long that was used to tension the guy wire. d) Jones Unit 3, Woodcock Twp, Crawford Cnty, PA - On or about June 12, 2008 the left side rear crown guy wire was anchored to an eleven inch (11") maple tree. e)Jones Unit 3, Woodcock Twp, Crawford Cnty, PA - On or about June 12, 2008 the right side racking board guy wire was anchored to the pipe tub. f) Jones Unit 3, Woodcock Twp, Crawford Cnty, PA - On or about June 12, 2008 the left side racking board guy wire was anchored to the pipe tub. ABATEMENT NOTE: Among others, one feasible and useful abatement method to correct this hazard is to: (1) Follow the requirements of Wilson Manufacturing Co. Guyline Arrangement specification (which replicates the posted placard mounted on the rig provided by the manufacturer) and American Petroleum Institute (API ) 4E Drilling and Well Servicing Structures (2) Utilize the come-a-long manufacturer's specifications that prescribe "chaining around" the come-a-long tension system in the guy wire/anchor assemblyhor