Violation Detail
Standard Cited: 19100036 B02 Design and construction requirements for exit routes.
Inspection Nr: 302550256
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $1,125.00
Current Penalty: $1,125.00
Issuance Date: 06/17/1999
Nr Instances: 2
Nr Exposed: 31
Abatement Date: 07/20/1999
Gravity: 01
Report ID: 0213100
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis: