Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 300441805
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $625.00
Current Penalty: $312.50
Issuance Date: 05/21/1997
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/01/1997
Gravity: 03
Report ID: 0111700
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | 10/15/1997 | $312.50 | 12/01/1997 | Serious | |
| Penalty | I: Informal Settlement | 06/04/1997 | $312.50 | 08/25/1997 | Serious | |
| Penalty | Z: Issued | 05/21/1997 | $625.00 | 07/09/1997 | Serious |
Translate