Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1442331.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $4,048.00
Current Penalty: $2,024.00
Issuance Date: 03/30/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/14/2020
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 04/10/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/10/2020 | $2,024.00 | 05/14/2020 | Serious | |
Penalty | Z: Issued | 03/30/2020 | $4,048.00 | 05/14/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a. At the site located at 126290 S HWY 27 Clermont, FL, building D, employees working installing stone on wall were exposed to a 12' 4" fall hazards from missing planks, on or about October 30, 2019.