Violation Detail
Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.
Inspection Nr: 1397455.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,282.00
Current Penalty: $9,282.00
Issuance Date: 10/22/2019
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 12/10/2019
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 11/15/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/15/2019 | $9,282.00 | 12/10/2019 | Serious | |
| Penalty | Z: Issued | 10/22/2019 | $9,282.00 | 12/10/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complies with recognized and generally accepted good engineering practices: a) On or about 08/30/2019, at the Kosan Crisplant propane facility, a pressure gauge for an 18,000 gallon propane tank was not functional, in that it was filled with liquid and not legible.