Violation Detail
Standard Cited: 5A0001 OSH Act General Duty Paragraph
Inspection Nr: 122466626
Citation: 01001
Citation Type: Serious
Abatement Status: I
Initial Penalty: $1,750.00
Current Penalty: $875.00
Issuance Date: 12/08/1998
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 12/11/1998
Gravity: 05
Report ID: 0523300
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/23/1998 | $875.00 | 12/11/1998 | Serious | |
| Penalty | Z: Issued | 12/08/1998 | $1,750.00 | 12/11/1998 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: HEAT
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: a) On or about August 15, 1998, employees were exposed to the hazard from escaping steam and liquids and injuries and lacerations from flying debris and broken glass when the jacketed steam heated kettle exploded when the discharge became plugged or restricted. "AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THIS HAZARD IS...." To use pressure reduction valves prior to the kettle inlet and a pressure relief device (safety valve) on the reducer bypass and/or on the steam heated kettle. Additional safety is required on pipe valve and fitting sizing in that the inlet (high pressure) discharge openings must be significantly less than the larger openings at discharge as stipulated in ASME, boiler and pressure vessel code or Wisconsin boiler and plumbing code.ing