The U.S. Department of Labor will be conducting scheduled system maintenance beginning Friday, Feb. 15 at 5 p.m. ET through Tuesday, Feb. 19 at 8 a.m. ET. Some pages may be temporarily unavailable. To report an emergency, file a complaint with OSHA, or to ask a safety and health question, call 1-800-321-6742 (OSHA).

OSHA LOTO eTool
OSHA LOTO eTool
eTools Home : Lockout/Tagout Standard | Preamble | Directive | Interps | Case Law | Credits
OSHA LOTO eTool
OSHA LOTO eTool
lock Lockout/Tagout
LOTO HomeTutorialHot TopicsInteractive Case StudiesAbout this Tool
 
 Links to other
 Web sites with
 information on
 LOTO
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Case Studies  

Case Study 7: Overhead Crane Servicing and Maintenance

Correct.  The employer is not required to develop two separate energy control programs.

The employer could develop and implement a single written energy control program provided that this program addressed the applicable requirements of both 29 CFR 1910.147 and 29 CFR 1910.333.







  Home | Tutorial | Hot Topics | Case Studies | About This Tool | Credits

OSHA LOTO eTool
eTools Home : Lockout/Tagout Standard | Preamble | Directive | Interps | Case Law | Credits
OSHA LOTO eTool
OSHA LOTO eTool