Slide 5

    TEXT VERSION OF SLIDE:

    Title: (b) Definitions (cont'd)
    Type: Text Slide
    Content:
    • Building/Facility Owner: the legal entity, including a lessee, which exercises control over management and recordkeeping function relating to a building and/or facility in which activities covered by this standard take place
    • Disturbance: activities that disrupt the matrix of ACM or PACM, crumble or pulverize ACM or PACM, or generate visible debris from ACM or PACM
    • Includes cutting away small amounts of ACM and PACM, no greater than the amount which can be contained in one standard-sized glove bag or waste bag in order to access a building component
    • Intact: ACM that has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix