Alliance -- An OSHA Cooperative Program << Back to The Business Case For Safety


HOME
Slides 1-10
Slides 11-20
Slides 21-30
Slides 31-40
Slides 41
Slides 42
Slides 43
Slides 44
Slides 45
Slides 46
Slides 47
Slides 48
Slides 49
Slides 50
Slides 51-60
Slides 61-70

Previous  |  Next
Slide 41
 

    TEXT VERSION OF SLIDE:

    Title: GREAT AMERICAN BALLPARK -- RESULTS
    Type: Text Slide
    Content:
    • After 1.2 million construction hours, a job-lost time rate of 0.8
    • Estimated savings from Owner Control Insurance Program (July 1999-May 2003) was $3.125 million (project is on-going until July 2005)