Scheduled Maintenance - President's Day Weekend
The U.S. Department of Labor will be conducting scheduled system maintenance beginning Friday, Feb. 15 at 5 p.m. ET through Tuesday, Feb. 19 at 8 a.m. ET. Some pages may be temporarily unavailable. To report an emergency, file a complaint with OSHA, or to ask a safety and health question, call 1-800-321-6742 (OSHA).

<< Return to Previous Page

Group Drop Tamping/Burner Hood


Group Drop Tamping/Burner Hood

Text Version

Group Drop Tamping/Burner Hood

Tamping burner hood showing employee work location, perforated plate 40%, screen and slot, and taper take-off. Side view of employee reaching over belly bar for battery at tamping burner hood location.
Note: 3" Maximum distance for belly bar. Must consider ergonomic problems which may occur if employee must lift batteries from a further distance.

Design Criteria:

Q = 650 x L cfm
Vslot = 2,000 fpm
Vtransport ³ 4,200 - 4,500 fpm
he = 2.2 VPduct

Note: 3" maximum distance for belly bar. Must consider ergonomic problems which may occur if employee must lift batteries from a further distance.