Scheduled Maintenance - President's Day Weekend
The U.S. Department of Labor will be conducting scheduled system maintenance beginning Friday, Feb. 15 at 5 p.m. ET through Tuesday, Feb. 19 at 8 a.m. ET. Some pages may be temporarily unavailable. To report an emergency, file a complaint with OSHA, or to ask a safety and health question, call 1-800-321-6742 (OSHA).

<< Return to Previous Page

Drag Link Conveyor Configurations (Part 2)


Drag link Conveyor Configurations (Part 2)

Text Version

Drag link Conveyor Configurations (Part 2)

Drag Link Conveyor Configurations:
  1. "Z" type, Parallel Run
  2. A. Modified Parallel Run
  3. Horizontal Square Loop w/ Gooseneck
  4. Golf Club
  5. Capacity Chart
  6. General Design Information 
These sketches illustrate typical tubular drag
conveyor layouts. They may be modified or combined to suit specific applications