Standard Number > 1926 > 1926.755
- 1926.755 - Decision to release the new compliance directive for the steel erection standard in draft form. [12/21/2001]
- 1926.755 - History and background of the Steel Erection Final Rule. [09/27/2001]
- 1926.755 - Whether the four-bolt requirement in §1926.755(a)(1) applies to a pre-existing column that will be left in place during a renovation/alteration project. [03/10/2006]
- 1926.755(a)(1) - Acceptability of using a sleeve to anchor a column; protection from hazard of swaying columns. [11/17/2004]
- 1926.755(a)(1) - Steel erection columns must be anchored by 4 rods and meet 300-lb strength criteria. [05/27/2004]
- 1926.755(a)(1) - Whether the four-bolt requirement in §1926.755(a)(1) applies to a pre-existing column that will be left in place during a renovation/alteration project. [03/10/2006]
- 1926.755(a)(2) - Acceptability of using a sleeve to anchor a column; protection from hazard of swaying columns. [11/17/2004]
- 1926.755(a)(2) - Steel erection columns must be anchored by 4 rods and meet 300-lb strength criteria. [05/27/2004]
- 1926.755(b) - Mortar testing requirements and controlling contractor responsibilities under the Steel Erection Standard. [12/27/2002]
- 1926.755(b) - Notification requirements for concrete compressive strength and anchor bolt modifications. [12/23/2005]
- 1926.755(b)(2) - Clarification of "Controlling Contractor" duties under the Steel Erection Standard (1926 Subpart R) [01/30/2002]
- 1926.755(b)(2) - Notification requirements for concrete compressive strength and anchor bolt modifications. [12/23/2005]