Standard Number > 1926 > 1926.550
- 1926.550 - Applicability of the steel erection standard to pre-cast concrete erection work; pre-planning of hoisting routes and procedures. [10/29/2002]
- 1926.550 - Christmas Treeing, Steel Erection. [03/16/1988]
- 1926.550 - Corrections to general industry standards incorporated into the construction standards. [08/21/1996]
- 1926.550 - Fall protection for steel erection and the requirements for lifting tandem loads. [06/06/1994]
- 1926.550 - Modified approach to lifting several steal beams at one time. [12/06/1991]
- 1926.550 - Whether §1926.550(g) applies to boom-attached personnel lifting platforms and, if not, whether OSHA requires proof testing of such platforms; what is the meaning of "at each new job site" in ASME B30.23; and what standards apply to derrick mounted buckets on small electric line trucks. [01/12/2007]
- 1926.550(a) - Employees must be kept clear of suspended loads, including multiple lift loads. [08/20/2000]
- 1926.550(a)(9) - Backhoe barricading standards. [09/09/1977]
- 1926.550(a)(19) - Applicability of the steel erection standard to pre-cast concrete erection work; pre-planning of hoisting routes and procedures. [10/29/2002]
- 1926.550(a)(19) - Employee exposure to overhead loads in multiple lift rigging (christmas treeing) of steel members. [12/20/1996]
- 1926.550(b) - Employee exposure to overhead loads in multiple lift rigging (christmas treeing) of steel members. [12/20/1996]