Standard Number > 1926 > 1926.251
- 1926.251 - Cage, skip and load connections to hoist ropes. [08/19/1992]
- 1926.251 - Marking and proof-testing requirements for special custom-designed lifting accessories. [07/07/2003]
- 1926.251 - OSHA Requirements Addressing Fall Protection Equipment [12/02/1991]
- 1926.251 - Padded slings/wire rope during steel erection. [03/31/2010]
- 1926.251 - Proof testing of lifting beams used to lift wind turbine components. [06/08/2012]
- 1926.251 - Requirements for load-testing and marking of special custom-design rigging accessories; applicability of ASME standards. [02/09/2004]
- 1926.251 - Retesting of reassembled lifting accessories if original manufacturing controls are ensured; retesting requirement if repair/replacement of parts due to breakage, damage, or evidence of diminished capacity. [02/25/2003]
- 1926.251 - Rigging equipment for material handling. [01/19/1993]
- 1926.251 - Testing requirements for "lifting blinds" or "lifting covers" on pressure vessels. [03/01/2010]
- 1926.251 - Use of synthetic fiber slings. [02/10/1994]
- 1926.251 - Wire rope were used as a bull wire. [08/20/1976]
- 1926.251(a) - Marking and proof-testing requirements for special custom-designed lifting accessories. [07/07/2003]
- 1926.251(a)(1) - OSHA requirements applicable to use of the Contex "Magic Arm" below-the-hook lifting device. [01/25/2006]
- 1926.251(a)(2) - Alloy steel chain slings must not be loaded beyond working load limit. [08/04/2000]
- 1926.251(a)(4) - Custom-designed lifting accessories must be proof-tested and marked before being deployed for use and after repair or replacement. [06/14/2002]
- 1926.251(a)(4) - Marking and proof-testing requirements for special custom-designed lifting accessories. [07/07/2003]
- 1926.251(a)(4) - Proof testing of lifting beams used to lift wind turbine components. [06/08/2012]
- 1926.251(a)(4) - Requirements for load-testing and marking of special custom-design rigging accessories; applicability of ASME standards. [02/09/2004]
- 1926.251(a)(4) - Retesting of reassembled lifting accessories if original manufacturing controls are ensured; retesting requirement if repair/replacement of parts due to breakage, damage, or evidence of diminished capacity. [02/25/2003]
- 1926.251(a)(4) - Rigging equipment for material handling; custom-designed accessories. [08/15/2002]
- 1926.251(a)(4) - Testing requirements for "lifting blinds" or "lifting covers" on pressure vessels. [03/01/2010]
- 1926.251(a)(4) - Wire rope clips on suspension scaffolds; safety latches on large crane hooks; order of assembly for hanging scaffolds; and horizontal lifeline design. [03/04/2004]
- 1926.251(a)(5) - Testing requirements for "lifting blinds" or "lifting covers" on pressure vessels. [03/01/2010]
- 1926.251(b)(4) - Alloy steel chain slings must not be loaded beyond working load limit. [08/04/2000]
- 1926.251(c) - Requirements for wire rope fittings (CASTLOK Bend-Master) in construction. [10/05/1977]
- 1926.251(c) - Wire rope clips on suspension scaffolds; safety latches on large crane hooks; order of assembly for hanging scaffolds; and horizontal lifeline design. [03/04/2004]
- 1926.251(c)(3) - A knot in a wire rope is a recognized hazard for material handling. [12/14/1977]
- 1926.251(c)(4)(iii) - Clarification on standard for rigging equipment for material handling - wire rope. [03/07/1975]
- 1926.251(c)(9) - Padded slings/wire rope during steel erection. [03/31/2010]

Newsletter
RSS Feeds
Print This Page
Text Size

