Standard Number > 1910 > 1910.269
- 1910.269 - A qualified employee wearing a short sleeve shirt when working on or nearby energized electric power line or equipment and subject to potential exposure to an electric arc. [07/31/1995]
- 1910.269 - An interpretation of the electric power generation standard. [02/19/1997]
- 1910.269 - Apparel requirements for line-clearence tree-trimmers. [10/29/1998]
- 1910.269 - CPR training is a required element in some OSHA general industry standards. [11/01/2005]
- 1910.269 - CPR/first aid training and "working alone" provisions of 1910.269. [02/22/1999]
- 1910.269 - Challenge Testing as a Substitute for Annual Refresher Training. [11/27/1995]
- 1910.269 - Clarification o-f the electric power generation, transmission, and distribution standard. [06/23/1997]
- 1910.269 - Clarification of "in near proximity" and OSHA's discretion in enforcing first aid requirements in particular cases. [03/23/2007]
- 1910.269 - Clarification of LOTO procedures for servicing and maintenance of wind turbines. [06/26/2007]
- 1910.269 - Clarification of OSHA training requirements for basic first aid and cardiopulmonary resuscitation (CPR). [08/02/2012]
- 1910.269 - Clarification of Occupational Safety and Health Administration (OSHA) regulations. [02/26/1996]
- 1910.269 - Clarification of electric power generators, transmission and distribution standard. [07/18/1994]
- 1910.269 - Clarification of qualified employee requirements for the Electric Power Generation, Transmission, and Distribution standard. [03/27/2003]
- 1910.269 - Clarification of supervisor accessibility to individual field-lock keys in a group lock box under 1910.269. [07/20/2006]
- 1910.269 - Clarification of the 1910.269 requirement for the presence of at least two "qualified" employees for work on exposed energized lines. [10/10/2007]
- 1910.269 - Clarification of the Electric Power Generation, Transmission and Distribution Standard. [08/29/1995]
- 1910.269 - Clarification of the Electric Power Generation, Transmission, And Distribution Standard, 29 CFR 1910.269. [05/09/1995]
- 1910.269 - Clarification of the Electric Power Generation, Transmission, and Distribution Standard. [02/02/1995]
- 1910.269 - Clarification of the electric power generation, transmission, and distribution standard. [07/28/1995]
- 1910.269 - Clarification of the electric power generation, transmission, and distribution standard. [08/23/1995]
- 1910.269 - Clarification on number of qualified employees required when working with electrical components. [02/03/2010]
- 1910.269 - Compliance with electric power generation transmission and distribution requirements for testing of fiberglass insulating tools. [02/19/2008]
- 1910.269 - Conditions allowing the use of insulating gloves without the use of insulating sleeves when working on or near exposed energized parts. [09/01/2006]
- 1910.269 - Conditions rendering underground electrical power connections as unsafe to touch with bare hands. [04/25/2006]
- 1910.269 - Determination on whether the "Line Journeyman Changing out Trasformer" activities are within the intent of the OSHA standards. [03/05/1996]
- 1910.269 - Distinction between premises wiring installations and electric transmission or distribution installations. [08/16/1996]
- 1910.269 - Electric Power Generation, Transmission, and Distribution Final Rule. [10/18/1995]
- 1910.269 - Electric power generation, transmission, and distribution standard. [03/26/1996]
- 1910.269 - Electrical Conductor Identification. [12/18/1997]
- 1910.269 - Electrical Workers. [08/06/1996]
- 1910.269 - Enforcement of Electric Power Generation, Transmission, and Distribution and Electrical Protective Equipment. [03/07/1995]
- 1910.269 - Enhanced risk of damage/degradation of insulation integrity on temporary wiring with prolonged use. [11/22/2005]
- 1910.269 - Fall Protection in the power distribution industry. [09/01/1995]
- 1910.269 - Fall protection and aerial lifts in the Electric Power Generation, Transmission, and Distribution industries. [02/27/2006]
- 1910.269 - Final Rule on Electric Power Generation, Transmission, and Distribution. [12/01/1994]
- 1910.269 - General Industry Standard as it applies to the electric utility industry. [12/18/1997]
- 1910.269 - Grounding requirements for aerial lifts (bucket trucks) under the General Industry 1910.269 and Construction 1926.952 standards. [10/05/2004]
- 1910.269 - Group LOTO and supervisor's accessibility to individual employee lock when employee is not available to remove lock. [07/19/2006]
- 1910.269 - Guidelines for the Enforcement of the Apparel Standard. [08/10/1995]
- 1910.269 - Harness used for fall protection is not considered "apparel". [07/30/1996]
- 1910.269 - Imposing an undue hardship on the working man who is trying to do his job by keeping the electricity on for America to enjoy. [06/21/1995]
- 1910.269 - Installation and Placement of temporary protective grounds. [12/07/1995]
- 1910.269 - Interpretation of the Electric Power Generation, Transmission, and Distribution Standard. [07/27/1995]
- 1910.269 - Interpretation of the Electrical Power Generation, Transmission, and Distribution standard. [11/08/1994]
- 1910.269 - Interpretation of the electic power generation, transmission and distribution (electric power generation) standard. [08/23/1996]
- 1910.269 - Interpretation of the electric power generation, transmission, and distribution standard. [06/04/1996]
- 1910.269 - Interpretation of the electric power generation, transmission, and distribution standard. [12/07/1995]
- 1910.269 - Letter requesting interpretation of the OSHA electrical standards as they apply to employees using insulated hand tools. [05/20/1996]
- 1910.269 - Minimum approach distances. [02/26/1996]
- 1910.269 - Minimum number of employees required for performing electric power work conducted from bucket trucks. [09/16/2003]
- 1910.269 - Natural fabrics and synthetic materials that are acceptable under the electric power generation, transmission and distribution standard. [05/24/1994]
- 1910.269 - OSHA does not specify payment requirements for apparel covered in the Electrical Power Transmission and Distribution Standard. [05/27/2003]
- 1910.269 - OSHA requirements for providing training for first aid, CPR, and BBP for prompt treatment of injured employees at various workplaces. [01/16/2007]
- 1910.269 - OSHA's requirements for locking type snaphooks on pole strap systems. [03/13/1996]
- 1910.269 - PSM coverage of utility systems; whether 1910.269 preempts the PSM standard for power generation facilities that serve covered processes. [01/31/2008]
- 1910.269 - Permit space entry. [08/08/1994]
- 1910.269 - Protection of workers operating mechanical equipment near overhead power lines. [12/07/1999]
- 1910.269 - Qualifications required under 1910.269 for entry into manholes/vaults to perform work on energized conductors. [11/21/2006]
- 1910.269 - Requirements for reverse signal alarms for vehicles with obstructed views to the rear. [03/09/2004]
- 1910.269 - Rescue of a suspended worker following a fall event. [04/27/2004]
- 1910.269 - Response to Edison Electric Institute's concerns regarding draft Instruction CPL 2-1.18A, "Enforcement of the Electric Power Generation, Transmission and Distribution Standard." [06/13/2003]
- 1910.269 - Response to Exelon Generation's concerns regarding draft Instruction CPL 2-1.18A, "Enforcement of the Electric Power Generation, Transmission and Distribution Standard." [06/13/2003]
- 1910.269 - Scope of logging standard -- 1910.266. [03/12/1996]
- 1910.269 - Section that requires the employer to insure that apparel worn by employees not increase the injury should they be exposed to flame. [04/12/1995]
- 1910.269 - Standards applicable to step bolts and manhole steps; load requirements for step bolts. [05/05/2003]
- 1910.269 - Stress cone work: worker protection and job briefings. [06/22/1998]
- 1910.269 - Whether shutting off the truck and disabling controls is a sufficient means of demonstrating that no employee would be endangered under 1910.269(p)(1)(iii). [02/01/2008]
- 1910.269(a)(1) - PSM coverage of utility systems; whether 1910.269 preempts the PSM standard for power generation facilities that serve covered processes. [01/31/2008]
- 1910.269(a)(1) - Use of ANSI C2-1997 as guidance for protecting employees working near insulated shielded conductors. [09/26/2002]
- 1910.269(a)(1)(i)(A) - Clarification of the Electric Power Generation, Transmission, And Distribution Standard, 29 CFR 1910.269. [05/09/1995]
- 1910.269(a)(1)(i)(E) - Clarification of 1910.269 as applied to line-clearance tree-trimming operations. [04/26/1999]
- 1910.269(a)(1)(iii) - PSM coverage of utility systems; whether 1910.269 preempts the PSM standard for power generation facilities that serve covered processes. [01/31/2008]
- 1910.269(a)(2) - Clarification of qualified employee requirements for the Electric Power Generation, Transmission, and Distribution standard. [03/27/2003]
- 1910.269(a)(2) - Clarification of training requirements for supervisory and managerial personnel under 1910.269. [03/10/2000]
- 1910.269(a)(2) - Fall protection and aerial lifts in the Electric Power Generation, Transmission, and Distribution industries. [02/27/2006]
- 1910.269(a)(2) - Qualifications required under 1910.269 for entry into manholes/vaults to perform work on energized conductors. [11/21/2006]
- 1910.269(a)(2)(i) - Clarification of qualified employee requirements for the Electric Power Generation, Transmission, and Distribution standard. [03/27/2003]
- 1910.269(a)(2)(i) - Clarification of the 1910.269 requirement for the presence of at least two "qualified" employees for work on exposed energized lines. [10/10/2007]
- 1910.269(a)(2)(i) - Training requirements for employees who perform non-electrical work on electrical equipment. [05/17/2002]
- 1910.269(a)(2)(ii) - Clarification of 1910.269 as applied to line-clearance tree-trimming operations. [04/26/1999]
- 1910.269(a)(2)(ii) - Clarification of the 1910.269 requirement for the presence of at least two "qualified" employees for work on exposed energized lines. [10/10/2007]
- 1910.269(a)(2)(ii) - Qualifications required under 1910.269 for entry into manholes/vaults to perform work on energized conductors. [11/21/2006]
- 1910.269(a)(2)(ii) - Training of workers who are not "qualified persons" under 1910.269. [06/09/1999]
- 1910.269(a)(2)(ii) - Training requirements for employees who perform non-electrical work on electrical equipment. [05/17/2002]
- 1910.269(a)(3) - Determining voltage ratings for electrical insulating equipment used during electrical power distribution and transmission work. [09/27/2005]
- 1910.269(b) - Clarification of "in near proximity" and OSHA's discretion in enforcing first aid requirements in particular cases. [03/23/2007]
- 1910.269(b) - Clarification of the 1910.269 requirement for the presence of at least two "qualified" employees for work on exposed energized lines. [10/10/2007]
- 1910.269(b) - OSHA Instruction CPL 2-2.53, Guidelines for First Aid Training Programs. [08/21/1997]
- 1910.269(b) - OSHA requirements for providing training for first aid, CPR, and BBP for prompt treatment of injured employees at various workplaces. [01/16/2007]
- 1910.269(b)(1) - CPR/first aid training and "working alone" provisions of 1910.269. [02/22/1999]
- 1910.269(b)(1) - Clarification of qualified employee requirements for the Electric Power Generation, Transmission, and Distribution standard. [03/27/2003]
- 1910.269(b)(1)(i) - Minimum number of employees required for performing electric power work conducted from bucket trucks. [09/16/2003]
- 1910.269(b)(1)(ii) - Rescue of a suspended worker following a fall event. [04/27/2004]
- 1910.269(c) - Determining voltage ratings for electrical insulating equipment used during electrical power distribution and transmission work. [09/27/2005]
- 1910.269(c) - Stress cone work: worker protection and job briefings. [06/22/1998]
- 1910.269(d) - Authorized employees must have the opportunity to verify energy isolation in group lockout/tagout [01/29/2002]
- 1910.269(d) - Clarification of supervisor accessibility to individual field-lock keys in a group lock box under 1910.269. [07/20/2006]
- 1910.269(d) - Group tagging requirements reqarding 1910.269(d). [10/14/1999]
- 1910.269(d) - Response to Edison Electric Institute's concerns regarding draft Instruction CPL 2-1.18A, "Enforcement of the Electric Power Generation, Transmission and Distribution Standard." [06/13/2003]
- 1910.269(d) - Response to Exelon Generation's concerns regarding draft Instruction CPL 2-1.18A, "Enforcement of the Electric Power Generation, Transmission and Distribution Standard." [06/13/2003]
- 1910.269(d)(3)(ii)(D) - Tagout devices must be non-reusable and self-locking. [01/03/2002]
- 1910.269(d)(3)(ii)(D) - Use of tagout device attachments not meeting 50-pound unlocking strength requirements. [01/14/2000]
- 1910.269(d)(4) - Clarification of LOTO procedures for servicing and maintenance of wind turbines. [06/26/2007]
- 1910.269(d)(6)(iv)(B) - Tagout devices must be non-reusable and self-locking. [01/03/2002]
- 1910.269(d)(6)(iv)(B) - Use of tagout device attachments not meeting 50-pound unlocking strength requirements. [01/14/2000]
- 1910.269(d)(7)(iv) - Clarification of supervisor accessibility to individual field-lock keys in a group lock box under 1910.269. [07/20/2006]
- 1910.269(d)(7)(iv) - Group LOTO and supervisor's accessibility to individual employee lock when employee is not available to remove lock. [07/19/2006]
- 1910.269(d)(8) - Clarification of supervisor accessibility to individual field-lock keys in a group lock box under 1910.269. [07/20/2006]
- 1910.269(d)(8) - Group LOTO and supervisor's accessibility to individual employee lock when employee is not available to remove lock. [07/19/2006]
- 1910.269(d)(8)(i) - Clarification of supervisor accessibility to individual field-lock keys in a group lock box under 1910.269. [07/20/2006]
- 1910.269(d)(8)(i) - Group LOTO and supervisor's accessibility to individual employee lock when employee is not available to remove lock. [07/19/2006]
- 1910.269(d)(8)(i)(A) - Group LOTO and supervisor's accessibility to individual employee lock when employee is not available to remove lock. [07/19/2006]
- 1910.269(d)(8)(ii) - Clarification of system operator exclusive control provisions. [11/21/2000]
- 1910.269(d)(8)(ii)(D) - Clarification of LOTO procedures for servicing and maintenance of wind turbines. [06/26/2007]
- 1910.269(d)(8)(v) - Clarification of system operator exclusive control provisions. [11/21/2000]
- 1910.269(d)(8)(v) - Response to Edison Electric Institute's concerns regarding draft Instruction CPL 2-1.18A, "Enforcement of the Electric Power Generation, Transmission and Distribution Standard." [06/13/2003]
- 1910.269(d)(8)(v) - Response to Exelon Generation's concerns regarding draft Instruction CPL 2-1.18A, "Enforcement of the Electric Power Generation, Transmission and Distribution Standard." [06/13/2003]
- 1910.269(e)(2) - Qualifications required under 1910.269 for entry into manholes/vaults to perform work on energized conductors. [11/21/2006]
- 1910.269(g) - Fall protection and foot protection for power line workers. [06/10/1999]
- 1910.269(g) - Fall protection during electrical maintenance and construction work on aerial lifts. [04/20/1998]
- 1910.269(g) - Payment for body belts, positioning straps, and pole and tree climbers. [03/16/2009]
- 1910.269(g) - Payment for body belts, positioning straps, and pole and tree climbers. [03/16/2009]
- 1910.269(g) - Stress cone work: worker protection and job briefings. [06/22/1998]
- 1910.269(g)(2) - Payment for body belts, positioning straps, and pole and tree climbers. [03/16/2009]
- 1910.269(g)(2) - Payment for body belts, positioning straps, and pole and tree climbers. [03/16/2009]
- 1910.269(g)(2)(v) - Clarification of the 1910.269 requirement for the presence of at least two "qualified" employees for work on exposed energized lines. [10/10/2007]
- 1910.269(g)(2)(v) - Payment for body belts, positioning straps, and pole and tree climbers. [03/16/2009]
- 1910.269(g)(2)(v) - Payment for body belts, positioning straps, and pole and tree climbers. [03/16/2009]
- 1910.269(h) - Standards applicable to step bolts and manhole steps; load requirements for step bolts. [05/05/2003]
- 1910.269(h)(2)(iv) - Standards applicable to step bolts and manhole steps; load requirements for step bolts. [05/05/2003]
- 1910.269(j) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part. [10/19/2006]
- 1910.269(j)(1) - Compliance with electric power generation transmission and distribution requirements for testing of fiberglass insulating tools. [02/19/2008]
- 1910.269(j)(1)(iii) - Compliance with electric power generation transmission and distribution requirements for testing of fiberglass insulating tools. [02/19/2008]
- 1910.269(l) - Conditions allowing the use of insulating gloves without the use of insulating sleeves when working on or near exposed energized parts. [09/01/2006]
- 1910.269(l) - Stress cone work: worker protection and job briefings. [06/22/1998]
- 1910.269(l)(1) - CPR/first aid training and "working alone" provisions of 1910.269. [02/22/1999]
- 1910.269(l)(1) - Clarification on number of qualified employees required when working with electrical components. [02/03/2010]
- 1910.269(l)(1) - Determining voltage ratings for electrical insulating equipment used during electrical power distribution and transmission work. [09/27/2005]
- 1910.269(l)(1) - Qualifications required under 1910.269 for entry into manholes/vaults to perform work on energized conductors. [11/21/2006]
- 1910.269(l)(1)(i) - Clarification of qualified employee requirements for the Electric Power Generation, Transmission, and Distribution standard. [03/27/2003]
- 1910.269(l)(1)(i) - Clarification of the 1910.269 requirement for the presence of at least two "qualified" employees for work on exposed energized lines. [10/10/2007]
- 1910.269(l)(1)(i) - Minimum number of employees required for performing electric power work conducted from bucket trucks. [09/16/2003]
- 1910.269(l)(1)(i) - Two employees must be present during work on energized systems >600 volts. [08/27/2001]
- 1910.269(l)(1)(i) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part. [10/19/2006]
- 1910.269(l)(1)(ii) - Minimum number of employees required for performing electric power work conducted from bucket trucks. [09/16/2003]
- 1910.269(l)(1)(ii) - Two employees must be present during work on energized systems >600 volts. [08/27/2001]
- 1910.269(l)(1)(ii) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part. [10/19/2006]
- 1910.269(l)(2) - Appropriate safety practices for the removal of electrical meters. [08/03/1999]
- 1910.269(l)(2) - Clarification on number of qualified employees required when working with electrical components. [02/03/2010]
- 1910.269(l)(2) - Conditions rendering underground electrical power connections as unsafe to touch with bare hands. [04/25/2006]
- 1910.269(l)(2) - Determining voltage ratings for electrical insulating equipment used during electrical power distribution and transmission work. [09/27/2005]
- 1910.269(l)(2) - Exceptions to minimum approach distances for power generation, transmission and distribution. [02/10/2000]
- 1910.269(l)(2) - Grounding requirements for aerial lifts (bucket trucks) under the General Industry 1910.269 and Construction 1926.952 standards. [10/05/2004]
- 1910.269(l)(2) - Minimum approach distances when using insulating gloves and sleeves. [10/26/1999]
- 1910.269(l)(2) - Qualifications required under 1910.269 for entry into manholes/vaults to perform work on energized conductors. [11/21/2006]
- 1910.269(l)(2) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part. [10/19/2006]
- 1910.269(l)(2)(i) - Conditions allowing the use of insulating gloves without the use of insulating sleeves when working on or near exposed energized parts. [09/01/2006]
- 1910.269(l)(2)(i) - Stress cone work: worker protection and job briefings. [06/22/1998]
- 1910.269(l)(3) - Appropriate safety practices for the removal of electrical meters. [08/03/1999]
- 1910.269(l)(3) - Conditions allowing the use of insulating gloves without the use of insulating sleeves when working on or near exposed energized parts. [09/01/2006]
- 1910.269(l)(3) - Conditions rendering underground electrical power connections as unsafe to touch with bare hands. [04/25/2006]
- 1910.269(l)(3) - Determining voltage ratings for electrical insulating equipment used during electrical power distribution and transmission work. [09/27/2005]
- 1910.269(l)(3) - Exceptions to minimum approach distances for power generation, transmission and distribution. [02/10/2000]
- 1910.269(l)(3) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part. [10/19/2006]
- 1910.269(l)(3)(i) - Conditions allowing the use of insulating gloves without the use of insulating sleeves when working on or near exposed energized parts. [09/01/2006]
- 1910.269(l)(3)(ii) - Conditions allowing the use of insulating gloves without the use of insulating sleeves when working on or near exposed energized parts. [09/01/2006]
- 1910.269(l)(4) - Determining voltage ratings for electrical insulating equipment used during electrical power distribution and transmission work. [09/27/2005]
- 1910.269(l)(6)(iii) - OSHA does not specify payment requirements for apparel covered in the Electrical Power Transmission and Distribution Standard. [05/27/2003]
- 1910.269(l)(6)(iii) - Requirements for embroidery on flame-resistant clothing under 29 CFR 1910.269. [10/04/2006]
- 1910.269(m) - 1910.269: Application of personal protective grounds for employee protection. [12/06/1999]
- 1910.269(m) - Lockout/tagout: preferred means of energy isolation; non cord-and-plug powered equipment. [03/22/2000]
- 1910.269(m) - Stress cone work: worker protection and job briefings. [06/22/1998]
- 1910.269(m) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part. [10/19/2006]
- 1910.269(m)(1) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part. [10/19/2006]
- 1910.269(m)(3)(ii) - Network protectors must have the manual override position blocked, locked, or otherwise disabled; must need use of a tool to manually place in closed position. [03/07/2005]
- 1910.269(m)(3)(ix) - Stress cone work: worker protection and job briefings. [06/22/1998]
- 1910.269(m)(3)(viii) - Clarification of single and multiple crews for purposes of deenergizing lines. [06/09/2000]
- 1910.269(m)(3)(viii) - Stress cone work: worker protection and job briefings. [06/22/1998]
- 1910.269(n) - Stress cone work: worker protection and job briefings. [06/22/1998]
- 1910.269(n) - Use of live-line tools and exemption to the requirement for at least two employees to be present during work on an energized part. [10/19/2006]
- 1910.269(n)(2) - 1910.269: Application of personal protective grounds for employee protection. [12/06/1999]
- 1910.269(n)(6) - 1910.269: Application of personal protective grounds for employee protection. [12/06/1999]
- 1910.269(n)(6) - Grounding requirements for aerial lifts (bucket trucks) under the General Industry 1910.269 and Construction 1926.952 standards. [10/05/2004]
- 1910.269(n)(7) - 1910.269: Application of personal protective grounds for employee protection. [12/06/1999]
- 1910.269(n)(7) - Grounding requirements for aerial lifts (bucket trucks) under the General Industry 1910.269 and Construction 1926.952 standards. [10/05/2004]
- 1910.269(p)(1)(i) - PSM coverage of utility systems; whether 1910.269 preempts the PSM standard for power generation facilities that serve covered processes. [01/31/2008]
- 1910.269(p)(1)(ii)(A) - Requirements for reverse signal alarms for vehicles with obstructed views to the rear. [03/09/2004]
- 1910.269(p)(1)(ii)(B) - Requirements for reverse signal alarms for vehicles with obstructed views to the rear. [03/09/2004]
- 1910.269(p)(1)(iii) - Whether shutting off the truck and disabling controls is a sufficient means of demonstrating that no employee would be endangered under 1910.269(p)(1)(iii). [02/01/2008]
- 1910.269(p)(4) - Application of 1910.269 to aerial lift devices. [12/21/1998]
- 1910.269(r) - Clarification of 1910.269 as applied to line-clearance tree-trimming operations. [04/26/1999]
- 1910.269(r)(1)(iv) - Compliance with electric power generation transmission and distribution requirements for testing of fiberglass insulating tools. [02/19/2008]
- 1910.269(u)(4) - Use of ANSI C2-1997 as guidance for protecting employees working near insulated shielded conductors. [09/26/2002]
- 1910.269(u)(5) - Use of ANSI C2-1997 as guidance for protecting employees working near insulated shielded conductors. [09/26/2002]
- 1910.269(v) - Clarification of the 1910.269 requirement for the presence of at least two "qualified" employees for work on exposed energized lines. [10/10/2007]
- 1910.269(v)(4) - Use of ANSI C2-1997 as guidance for protecting employees working near insulated shielded conductors. [09/26/2002]
- 1910.269(v)(5) - Use of ANSI C2-1997 as guidance for protecting employees working near insulated shielded conductors. [09/26/2002]
- 1910.269(x) - Clarification of system operator exclusive control provisions. [11/21/2000]
- 1910.269(x) - Clarification of the 1910.269 requirement for the presence of at least two "qualified" employees for work on exposed energized lines. [10/10/2007]
- 1910.269(x) - Training of workers who are not "qualified persons" under 1910.269. [06/09/1999]
- 1910.269(x) - Training requirements for employees who perform non-electrical work on electrical equipment. [05/17/2002]