November 21, 2008 Letter # 20070216-7712 Re: Re-qualification requirements for mobile crane operators engaged in construction work. Question: What are the OSHA requirements for re-qualification of mo...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=27370
|
| 92. |
2008 - 07/17/2008 - Whether a combination course can meet refresher training requirements in 1910.120(e)(8) and the OSHA 10-hour construction industry outreach program. |
14k |
July 17, 2008 Ms. Barbara McCabe, Program Manager International Union of Operating Engineers National HAZMAT Program 1293 Airport Road Beaver, WV 25813 Dear Ms. McCabe: Thank you for your letter to t...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=27208
|
| 93. |
2008 - 07/16/2008 - Oil-filled transformers and underground construction. |
12k |
No Description Given....
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=27385
|
| 94. |
2007 - 05/29/2007 - Requirements for tapping or tying-in to asbestos containing cement water pipes for construction. |
27k |
May 29, [2007] Robert J. Prejeant, Esquire 240 Barrow Street P.O. Box 669 Houma, Louisiana 70361-0669 Dear Mr. Prejeant: Thank you for your letter dated December 19, 2006, to Secretary of Labor Elain...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=27283
|
| 95. |
2006 - 09/05/2006 - When protective measures must be installed after a hole is created on a construction worksite. |
14k |
September 5, 2006 Mr. Albert C. Rauck 980 Landings Loop Dr. N. Westerville, OH 43082 Re: When protective measures must be installed after a hole is created on a construction worksite. 29 CFR 1926.500...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=25457
|
| 96. |
2006 - 06/19/2006 - Whether construction workers while inside crane cabs or enclosed break areas on barges are required to wear life jackets. |
13k |
June 19, 2006 Scott A. Knowlen Cianbro One Hunnewell Square P.O. Box 1000 Pittsfield, Maine 04967 Re: Whether construction workers while inside crane cabs or enclosed break areas on barges are requir...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=25403
|
| 97. |
2006 - 06/01/2006 - Whether 1926.601 is applicable to personnel and burden carriers used in construction. |
14k |
June 1, 2006 Michael T. Gallagher Corporate Safety Manager North American Energy Services 1 Collins Dr. Carneys Point, N.J. 08069 Re: Whether §1926.601 is applicable to personnel and burden carr...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=25399
|
| 98. |
2006 - 05/12/2006 - Determination of work-relatedness on a construction site. |
13k |
This letter constitutes OSHA's interpretation only of the requirements discussed and may not be applicable to any situation not delineated within the original correspondence. May 12, 2006 Ms. Don...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=25373
|
| 99. |
2005 - 08/03/2005 - Engineering controls for removal of asbestos-containing construction mastic (Class II work operations). |
16k |
August 3, 2005 Ms. Wendy Blasser, MSPH, CIH Senior Loss Control Specialist Palm Beach County 160 Australian Avenue Suite 401 West Palm Beach, FL 33406 Dear Ms. Blasser: Thank you for your June 25, 20...
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=INTERPRETATIONS&p_id=25137
|
| 100. |
2004 - 05/28/2004 - The construction fall protection standard specifies fall arrest system requirements, but no footwear requirements. |
14k |
May 28, 2004 Mr. J. Ferriss Foster P.O. Box 180460 J.A. Moss Construction Company Richland, MS 39216 Re: Use of tennis shoes on steep roofs; §1926.501(b)(11); OSHAct Sec. 5(a)(1) [General Duty C...