Federal Registers
#
 1  2013 - 03/21/2013 - Kiewit Power Constructors Co. et al.; Application for a Permanent Variance and Request for Comments - 78: 17432-17448
 2  2013 - 02/15/2013 - CFR Correction - 78:11092
 3  2010 - 11/23/2010 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Rigging Equipment for Material Handling - 75:71455
 4  2010 - 08/24/2010 - Rigging Equipment for Material Handling; Extension of the Office of Management and Budget's (OMB) Approval of Information Collection (Paperwork) Requirements - 75:52033-52034
 5  2007 - 06/22/2007 - Construction Records for Rigging Equipment; Extension of the Office of Management and Budget's (OMB) Approval of Information Collection (Paperwork) Requirements - 72:34483-34485
 6  2002 - 07/18/2002 - Construction Records for Rigging Equipment; Extension of the Office of Management and Budget's (OMB) Approval of Information-Collection (Paperwork) Requirements - 67:47408-47409
 7  1999 - 10/29/1999 - Rigging Equipment for Material Handling - 64:58452-58453
 8  1997 - 07/14/1997 - Agency Information Collection Activities; Proposed Collection;Comment Request; Construction Records for Rigging Equipment (29 CFR 1926.251(c)(15)(ii)--Proof-testing of Welded End Wire Rope Attachments - 62:37621-37622

Standard Interpretations
#
 1  2012 - 06/08/2012 - Proof testing of lifting beams used to lift wind turbine components.
 2  2010 - 03/31/2010 - Padded slings/wire rope during steel erection.
 3  2010 - 03/01/2010 - Testing requirements for "lifting blinds" or "lifting covers" on pressure vessels.
 4  2004 - 02/09/2004 - Requirements for load-testing and marking of special custom-design rigging accessories; applicability of ASME standards.
 5  2003 - 07/07/2003 - Marking and proof-testing requirements for special custom-designed lifting accessories.
 6  2003 - 02/25/2003 - Retesting of reassembled lifting accessories if original manufacturing controls are ensured; retesting requirement if repair/replacement of parts due to breakage, damage, or evidence of diminished capacity.
 7  1994 - 02/10/1994 - Use of synthetic fiber slings.
 8  1993 - 01/19/1993 - Rigging equipment for material handling.
 9  1992 - 08/19/1992 - Cage, skip and load connections to hoist ropes.
 10  1991 - 12/02/1991 - OSHA Requirements Addressing Fall Protection Equipment
 11  1976 - 08/20/1976 - Wire rope were used as a bull wire.

Regulations (Standards - 29 CFR)
#
 1  1926.251 - Rigging equipment for material handling.