|
|
|
1951. SANITATION IN THE CONSTRUCTION INDUSTRY Priority: Other Significant. Major status under 5 USC 801 is undetermined. Unfunded Mandates: Undetermined Legal Authority: 29 USC 655; 40 USC 333 CFR Citation: 29 CFR 1926.51 Legal Deadline: None Abstract: On October 7, 1998, the Advisory Committee on Construction Safety and Health (ACCSH) recommended that OSHA consider proposed revisions to the construction sanitation standard (29 CFR 1926.51). OSHA believes that the ACCSH recommendation raises important issues regarding the type of sanitation facilities needed for construction workers. OSHA intends to issue an ANPRM to consider revisions to the sanitation standard that would include washing facilities, gender-separate and lockable toilet facilities, and (where other OSHA standards require change rooms), gender-separate and lockable change facilities.
Regulatory Flexibility Analysis Required: Undetermined Small Entities Affected: No Government Levels Affected: None
Agency Contact: Russell B. Swanson, Director, Directorate of Construction, Department of Labor, Occupational Safety and Health Administration, Room N3468, 200 Constitution Avenue NW, FP Building, Washington, DC 20210 RIN: 1218-AB87 | |||||||||||||||
|
|

Newsletter
RSS Feeds
Print This Page
Text Size
