|
|
| Standard Number: | 1926.652; 1926.652(g)(1)(ii) |
November 14, 2003 Mr. Thomas A. Bush, CSP Manager - EH&S Consultant OSEA 3748 South Park Avenue Buffalo, NY 14219-1802 Re 29 CFR 1926.652(g)(1)(ii) Dear Mr. Bush: This is in response to your letter dated April 10, 2003, to the Occupational Safety and Health Administration (OSHA) concerning trench shields (29 CFR 1926.652) being held flush with the top of the trench and road surface. We apologize for the delay in providing this response. We have paraphrased your question as follows: Question: Scenario - Our construction project calls for a trench to be excavated through a concrete or blacktop road surface. Excavation needs to be done in such a way that steel plates can cover the trench and support smooth traffic flow while unoccupied. In this situation, is it permissible under OSHA's excavation standards to install the trench shields flush with the top of the concrete or blacktop road surface? Answer There is no specific prohibition against installing a trench shield so that the top of the shield is flush with the top of the road surface in the situation you describe.1 Therefore, it is permissible. If you need additional information, please contact us by fax (202-693-1689) at: U.S. Department of Labor, OSHA, Office of Construction Standards and Guidance. You can also contact us by mail at U.S. Department of Labor, OSHA, Office of Construction Standards and Guidance, Room N3468, 200 Constitution Avenue, N.W., Washington, D.C. 20210, although there will be a delay in our receiving correspondence by mail. Sincerely, Russell B. Swanson, Director Directorate of Construction 1 Keep in mind that §1926.652(g)(1)(ii) states: Shields shall be installed in a manner to restrict lateral or other hazardous movement of the shield in the event of the application of sudden lateral loads. [back to text] |
|
|

Newsletter
RSS Feeds
Print This Page
Text Size
