|
OSHA Instruction STD 3-6.2 October 30, 1978
Jan. 31, 1978
OSHA PROGRAM DIRECTIVE #100-78
TO: REGIONAL ADMINISTRATORS/OSHA
THRU: DONALD E. MACKENZIE Field Coordinator
Subject: 29 CFR 1926.250(b)(1), Material Storage--As Related To interim
Storage of concrete Forms and Shoring Between Placements
1. Purpose
The purpose of this directive is to clarify the application of 29
CFR 1926.250(b)(1), Material storage, as elated to concrete forms and
shoring.
2. Documentation Affected
This directive supersedes Field Information of the National Office
#74-86 dated October 22, 1974.
3. Background
It has been brought to the attention of the National Office that
contractors have been cited under 29 CFR 1926.250(b)(1) when lumber normally
used as concrete forms and shoring is bundled and stockpiled within 10 feet
of an exterior wall which does not extend above the top of the material
stored.
4. Action
a. The equipment used for shoring of newly placed concrete (forms,
shoring jacks, clamps, steel rods or pipes, base plates and other items that
are in use) is "equipment" subject to the standards contained in Subpart Q,
29 CFR 1926.700, 701 and 702. "Material storage" as defined in 29 CFR
1926.250(b)(1) does not apply except in a static situation.
OSHA Instruction STD 3-6.2 October 30, 1978
b. When stripped forms and shoring are bundled and placed within
close proximity to an open-sided floor (in order to preclude a "sidepick" by
a crane), for movement to another tier for placement, it must be considered
as in-process equipment. During routine operations, all normal safety
precautions shall be taken. When the bundles are to be left overnight or for
a longer period of time, they shall be anchored and braced in such a manner
to prevent displacement in any direction. All periphery guards shall be in
place except when the bundles are actually being removed through the
opening.
c. Equipment of this type, not actually in use as process
equipment and positioned on the jobsite for an indefinite period of time,
would be covered under 29 CFR 1926.250(b)(1), Material storage .
d. The application of these standards depends on the specific
conditions, as stated in the preceding paragraphs, found by the CSHO at the
time of the inspection.
5. Effective Date
This directive is effective immediately and will remain in effect
until canceled or superseded.
Richard P. Wilson Deputy Director, Federal Compliance and State Programs
DISTRIBUTION:
A-1 E-1 B-2 HEW-1 C-1 NIOSH Regional
Directors-1 D-4&5 NACOSH-1 Training Institute-4)
(Originator: OCCS)
|