Standard Cited:19100119 M04 II Process safety management of highly hazardous chemicals.

Violation Items
Nr: 311611081 Citation: 03003 Issuance: 03/08/2010 ReportingID: 0524700
Viol Type:Other NrInstances:2 Contest Date:03/31/2010
Abatement Date:03/08/2010 Nr Exposed:13 Final Order:
Initial Penalty: REC: Emphasis:
Current Penalty: Gravity:01 Haz Category:REFINERY



Text For Citation: 03 Item/Group: 003 Hazard: REFINERY

29 CFR 1910.119(m)(4)(ii): The report prepared at the conclusion of the investigation of an incident which resulted in, or could reseasonably have resulted in a catastrophic release of highly hazardous chemical in the workplace, did not include the date the investigation began: a.BP-Husky Refining, LLC located in Oregon, Ohio: On or about November 16, 2009, the Incident Report 2003-IR-561854 which involved a flare line leak in the Alky 1 unit on or about July 7, 2003, did not include the investigation start date. b.BP-Husky Refining, LLC located in Oregon, Ohio: On or about November 16, 2009, the Incident Report 2006-IR-1810345 which involved a leak in the East flare line near the Alky 2 unit on or about April 26, 2006, did not include the investigation start date. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.t,