29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment that are outside acceptable limits (as defined by process information in 29 CFR 1910.119(d) before further use or in a safe and timely manner: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not ensure PSV-1299, located in the Alky Unit, has an inlet pressure drop of not more than 3 PSV-1299 was determined to have an inlet pressure drop of 5.0 Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.
|