Standard Cited:19100119 D03 II Process safety management of highly hazardous chemicals.

Violation Items
Nr: 311611081 Citation: 02005A Issuance: 03/08/2010 ReportingID: 0524700
Viol Type:WillFul NrInstances:1 Contest Date:03/31/2010
Abatement Date:04/19/2010 Nr Exposed:25 Final Order:
Initial Penalty:70000.00 REC: Emphasis:
Current Penalty:70000.00 Gravity:10 Haz Category:REFINERY



Text For Citation: 02 Item/Group: 005A Hazard: REFINERY

29 CFR 1910.119(d)(3)(ii): The employer does not document that the equipment in the process complies with recognized and generally accepted good engineering practices: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not document that PSV-1299 providing relief protection to the Cat Gas Light Oil/BFW Preheater complies with recognized and generally accepted good engineering practices, in that, it has an inlet pressure drop greater than 3 PSV-1299 was determined to have an inlet pressure drop of 5.0 Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance with the standards including documentation that each pressure relief valve and associated piping for all process units have been evaluated and, if necessary, repaired or replaced to ensure inlet pressure drop is limited in accordance with recognized and generally accepted good engineering practices, such as API Recommended Practice 520 and the ASME Boiler and Pressure Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certification of its full compliance with the standard.