29 CFR 1910.119(j)(4)(i): Inspections and tests were not performed on process equipment to maintain its mechanical integrity: a.BP-Husky Refining, LLC located in Oregon, Ohio: On or about September 10, 2009, the employer did not ensure the pressure gauge for the butylene feed coalescer (PR 51- 1467) located in the Alky 1 unit was calibrated on a periodic basis, per manufacturer guidelines. b.BP-Husky Refining, LLC located in Oregon, Ohio: On or about September 10, 2009, the employer did not ensure the pressure gauges for the recycle isobutane coalescer (PR 51-1469) located in the Alky 1 unit were calibrated on a periodic basis, per manufacturer guidelines. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
|