29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (as defined by process information in 29 CFR 1910.119(d) before further use or in a safe and timely manner: a.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Compressor Discharge Condenser-Top (PR 543018) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. b.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Compressor Discharge Condenser-Btm (PR 543019) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. c.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Compressor Discharge Condenser-Top (PR 543020) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. d.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Compressor Discharge Condenser-Btm (PR 543021) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. e.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Isobutane Tower Overhead Condenser-Top (PR 543023) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. f.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Isobutane Tower Overhead Condenser-Btm (PR 543024) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. g.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Debutanizer Overhead Condenser-East (PR 543027) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. h.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Debutanizer Reboiler (PR 543028) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. i.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Debutanizer Overhead Condenser-West (PR 543048) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. j.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Total Alkylate Cooler (PR 543238) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. k.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Condensate Effluent Exchanger-Top (PR 543596) in the Alky 1 unit was deficient, in that, it did not have a grounding cable. l.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Condensate Effluent Exchanger-Btm (PR 543597) in the Alky 1 unit was deficient in, that, it did not have a grounding cable. m.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Acid Settler/Dry Drum (PR 511383) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. n.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Isobutane Coalescer (PR 511392) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. o.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Butane Recycle Coalescer (PR 511394) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. p.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Effluent Coalescer (PR 511399) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. q.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Caustic Storage Drum (PR 511481) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. r.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Depropanizer Feed Treater (PR 511518) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. s.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Rerun Tower Bottoms Reboiler (PR 540007) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. t.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Feed Chiller (PR 540061) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. u.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Recycle Chiller (PR 543558) in the Alky 2 unit was deficient, in that, it did not have a grounding cable. v.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the DIB Overhead Receiver (PR 511443) in the Alky 3 unit was deficient, in that, it did not have a grounding cable. w.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the Hydrocarbon Degasser (PR 511743) in the Alky 3 unit was deficient, in that, it did not have a grounding cable. x.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure the Safety Instrumented System bypass functions overseen in the central control room were password protected or controlled with a keyed lock. y.BP-Husky Refining, LLC - Oregon, Ohio: On or about September 10, 2009, the employer did not ensure an intervening valve between the relief device and the Sour Gas knock out drum (PR511923) was car sealed open. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.t,
|