| |
Links to other
Web sites with
information on
LOTO |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
|
Case Study 5:
Sour Water Pipeline Repairs
Incorrect. Here, the
employer has not met the requirements.
Prior to the start of work, the authorized employees
did not personally verify the isolation of the two sour water valves at the tank
farm, as required by
29 CFR 1910.147(d)(6) and
(f)(3)(ii)(D).
|