Case Study 5:
Sour Water Pipeline Repairs
Correct. The employer has not met the requirements.
Prior to the start of work, the authorized employees did not
verify the isolation of the two sour water valves at the tank farm, as required
by
29 CFR 1910.147(d)(6) and
(f)(3)(ii)(D). The employer may designate a primary authorized employee to
verify isolation, and other authorized employees must be permitted to verify
isolation if they choose.
|