Links to other
Web sites with
information on
LOTO |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
|
Case Study 3: Replacement of Nitrogen Pressure Vessel Seals
Correct.
The
Lockout/Tagout standard does not specifically require the use of a work
authorization permit. An employer may choose to use a generic energy control
procedure and a work authorization permit to meet the requirements of
1910.147(c)(4). If the employer uses this method, the work authorization
permit must identify the equipment to be serviced or maintained, the types and
unique energy characteristics to be encountered, methods for safe work, and the
process or procedures to be used to safely accomplish the task. The company
procedure must specify that the employees are required to perform their work in
accordance with the terms and limitations of the work permit.
For more information:
Refer to
Work permits in lockout/tagout standard requirements, for further details.
|