COMPREHENSIVE SAFETY AND HEALTH PARTNERING AGREEMENT
BETWEEN
THE UNITED STATES DEPARTMENT OF LABOR
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
TARRYTOWN AREA OFFICE,
THE NEW YORK STATE DEPARTMENT OF LABOR
DIVISION OF SAFETY AND HEALTH
ON-SITE CONSULTATION PROGRAM
THE GENERAL CONTRACTORS ASSOCIATION OF NEW YORK, INC.
and
SKANSKA/TULLY JV, INC.
 |
Section 1.0 Background
Section 2.0 Definitions
Section 3.0 Croton Water Treatment Facility History
Section 4.0 Partnership Goals and Objectives
Section 5.0 Performance Criteria
Section 6.0 Measurement and Evaluation of Performance
Section 7.0 Communication of Results
Section 8.0 Employee Involvement and Employee Rights
Section 9.0 OSHA Inspections
Section 10.0 Incentives
Section 11.0 Termination of Partnership
Section 12.0 Signatures
1.0 Background
In an effort to eliminate serious hazards and achieve a high level of worker safety and health on
the Croton Water Treatment Facility, Skanska/Tully JV and the above named groups have developed a
comprehensive partnering agreement. Participants include Project stakeholders from government,
industry employers, labor, and trade associations. This partnering agreement will facilitate the
process of: identifying Project health and safety performance goals; developing plans for achieving
those goals; cooperation in hazard control implementation; measuring and establishing a vehicle to
communicate the successes; and ultimately learning from the process.
This partnering agreement shall be limited to Skanska/Tully JV, OSHA's Tarrytown Area Office (OSHA),
the New York State Department of Labor Division of Safety and Health On-Site Consultation Program
(NYS Consultation), and the General Contractors Association of New York, Inc. (GCA). It is
anticipated that at the peak of this project, Skanska/Tully JV and its subcontractors will employ
over 650 trades employees.
This partnership is consistent with OSHA's long-range efforts to develop a contractor/government
partnership approach to safety and health management. It allows for better use of OSHA resources,
innovation in safety and health management, and encourages more participation in the safety and
health process from the construction/trade association communities.
2.0 Definitions
DART: Days away from work, restricted work activity, or job transfer
Investigations: The procedure for responding to non-formal complaints described in OSHA's Field
Inspection Reference Manual. This procedure mandates that OSHA contact an employer and inform them
of the safety and/or health hazards that are alleged, by a complainant, to exist in that employer's
workplace. OSHA then faxes a copy of the allegations to the employer. The employer must
satisfactorily respond to the allegations within five calendar days, or an OSHA enforcement
inspection may be initiated.
TCIR: (Total Case Incident Rate) This injury and illness rate is calculated by dividing the number
of lost worktime events by the total number of employee hours worked, and then multiplying by
200,000. The resultant rate reflects the injury and illness rate per 100 full-time workers.
Other-than-Serious Violations: This type of violation references situations where the most serious
injury or illness that would be likely to result from a hazardous condition cannot reasonably be
predicted to cause death or serious physical harm to exposed employees but does have a direct and
immediate relationship to their safety and health.
Qualified Safety and Health Representative: For the purpose of this
Partnership only, a Qualified Safety and Health Representative will, as a minimum, be certified
in the OSHA 30-hour Construction Course, or have substantial construction safety and health
experience.
Serious Violations: Section 17(k) of the Act provides " . . . a serious
violation shall be deemed to exist in a place of employment if there is a substantial probability
that death or serious physical harm could result from a condition which exists, or from one or more
practices, means, methods, operations, or processes which have been adopted or are in use, in such
place of employment unless the employer did not, and could not with the exercise of reasonable
diligence, know of the presence of the violation."
Verification Inspection: A limited scope inspection that will focus on the following areas: a
comprehensive review of the required safety and health programs and a site review of Fall,
Struck-by, Electrocution, and Caught-Between hazards.
Voluntary Protection Programs: The Voluntary Protection Programs (VPP) promotes effective
worksite-based safety and health. In the VPP, management, labor, and OSHA establish cooperative
relationships at workplaces that have implemented a comprehensive safety and health management
system. Approval into VPP is OSHA's official recognition of the outstanding efforts of employers and
employees who have achieved exemplary occupational safety and health.
VPPPA: The VPPPA promotes the benefits of cooperative programs among employees, management and labor
through educational and outreach services, as well as an active government affairs program.
Educational opportunities include workshops, conferences and presentations throughout the United
States. Outreach programs include the Association's quarterly magazine The Leader, electronic
newsletters, the VPPPA Mentoring Program and the VPPPA Web site.
3.0 Project History
Skanska/Tully JV. has a workforce of 650 employees, is involved in heavy construction, and is
headquartered in Whitestone NY.
SKANSKA/TULLY JV is the general contractor for the Croton Water Treatment Facility. The Croton Water
Treatment Facility involves the construction of a cast-in-place concrete building, steel-access
platforms, Fabrication and instillation of Process Mechanical Equipment and Piping System.
Construction for the Croton Water Treatment Facility will commence on August 21, 2007 and is
scheduled to be completed on, or about, April 21, 2012.
During construction, SKANSKA/TULLY JV will provide a full time safety manager and ensure compliance
with construction environmental, health, and safety practices. This includes federal, state, local,
Croton Water Treatment Facility, and owner rules and regulations.
4.0 Partnership Goals and Objectives
4.1 The goals of this Partnership include:
- Developing a contractor/government partnership that will encourage local construction
subcontractors involved in the Project to improve their safety and health performance;
- Assisting the participating local construction subcontractors in achieving the objectives listed
below;
- Implementing strategies to eliminate serious accidents, including the four primary construction
hazards (falls, electrical, caught in/between, and struck-by);
- Ensuring employee safety and health training;
- Recognizing those subcontractors with exemplary safety and health programs;
- A Project DART rate that is 25% less than the national average for Standard Industry Code XXXX.
4.2 The objectives of this Partnership include:
- Reducing the number of conditions that have the potential to result in worker injury/illness to
the lowest reasonable level, through employee training and hazard(s) identification and correction;
- 100% compliance with project-required incident prevention activities;
- Zero (0) fatalities;
- Zero (0) exposure of employees to walking/working surfaces (horizontal and vertical) with
unprotected sides or edges, which are 6 feet or more above a lower level;
- Conducting a gap analysis of all participating contractors' site-specific safety and health
programs and, through resource sharing, enhance these programs to meet the Partnership Agreement
performance criteria. "Gap analysis" is the difference between the contractor's site-specific
programs and SKANSKA/TULLY JV's requirements for work procedures each contractor is to perform.
SKANSKA/TULLY JV will evaluate each contractor's site-and task specific analysis to ensure that it
meets the required safety and health performance criteria for the site prior to commencement of
their onsite activities. SKANSKA/TULLY JV will provide reasonable assistance to subcontractor to
improve their safety program.
- Fostering a sustainable working relationship between SKANSKA/TULLY JV, OSHA, local contractors,
building and construction trades, and other entities involved in this Croton Water Treatment
Facility;
- Partnering with the GCA and the union representative framework to encourage positive change
within the local construction industry with respect to betterment of construction safety and health
during the project.
- Discussions of the benefits of participation in the VPP, and initiation of the VPP Application
process.
To achieve the goals and objectives cited above, OSHA, SKANSKA/TULLY JV, NYS Consultation, and GCA
will form an Implementation Team (IT) comprised of representatives of their organizations. These
representatives will work together to develop a plan of action, determine the working procedures of
the IT, identify the roles and responsibilities of the participants, and develop a time-line for the
goals and objectives described in this Partnership document. This time-line will also establish the
dates for submission of data and other records to OSHA by SKANSKA/TULLY JV, as described in this
Partnership document.
The IT will meet within 30 working days of the signing of this Partnership to review the goals and
objectives described herein. It will meet three times per year thereafter, for the duration of the
Partnership, to evaluate progress toward the Goals and Objectives. Annually, at least one of these
meetings will be in person
5.0 Performance Criteria
5.0.1 Safety and Health Contract Language
SKANSKA/TULLY JV shall incorporate safety and health program performance requirements into all
contracts including new hire orientations and weekly safety and health craft meetings.
5.0.2 Experience Modification Rates
Only contractors with an Experience Modification Rating (EMR) rating of 1 or less will be employed
at the site. SKANSKA/TULLY JV may make an exception to this condition for contractors under the
following conditions:
- The Contractor has made significant progress in safety and health since receiving the EMR that
exceeded 1.0, and agrees to comply with all provisions of the SKANSKA/TULLY JV "Safety, Health and
Environmental Policy" manual;
- SKANSKA/TULLY JV determines that the elevated EMR was not due to serious, consistent infractions
of OSHA safety and health standards.
5.0.3 Bidding Period
The bid packages, distributed by SKANSKA/TULLY JV to all potential bidders, include a copy of
Skanska/Tully JV's "Safety, Health and Environmental Policy" manual.
5.0.4 Pre-Construction Meetings
Prior to the start of construction work, SKANSKA/TULLY JV shall conduct a pre-construction meeting
with each successful bidder which shall include discussion regarding requirements for the successful
bidder to integrate SKANSKA/TULLY JV's "Safety, Health and Environmental Policy" into their standard
safety and health programs and performance expectations.
5.0.5 Coordination Meetings
SKANSKA/TULLY JV shall hold a weekly meeting with all project Managers, Company Owners, and/or
Foremen that shall include focused discussions addressing site safety and health issues.
5.0.6 Monthly Meetings
SKANSKA/TULLY JV shall hold a monthly project safety and health meeting to discuss program status
and participant performance. OSHA is welcome to attend these meetings. Invitations to attend the
meetings will be extended to Shop Stewards, as well as Foremen.
5.0.7 Qualified Safety and Health Representatives
SKANSKA/TULLY JV shall assign a qualified safety and health representative to administer its safety
and health program.
5.0.8 Risk Assessment
SKANSKA/TULLY JV shall conduct a comprehensive risk assessment of Project work and incorporate the
findings of the assessment into the Project Operations Plan.
5.0.9 Croton Water Treatment Facility-specific Safety and Health Plan Guidelines
SKANSKA/TULLY JV shall prepare a Croton Water Treatment Facility-specific safety and health plan to
be used as a baseline for contractor programs to meet or exceed. This plan shall incorporate the
following minimum elements:
- Fall exposure potential greater than six feet requires 100% fall protection
- Mandatory use of Ground Fault Interrupters (GFCIs) throughout the Croton Water Treatment Facility
- All cranes, hoists, and Skanska/Tully JV scissor/aerial lifts will be inspected and safe prior to use
- Use of appropriate personal protective equipment
- Site-specific safety and health training
- Workplace surveillance
- Employee involvement
- Management commitment
5.0.10 Weekly Safety and Health Audits
SKANSKA/TULLY JV shall ensure that weekly safety and health audits are conducted and documented by
SKANSKA/TULLY JV.
5.0.11 Training
SKANSKA/TULLY JV shall provide safety and health training resources for all project participants as
needed. Another objective of this training will be to familiarize all employees with the Safety
Management System. This will include the methods and contacts employees can use to address safety
and health concerns. Employees should be encouraged at the time of this training, and during other
safety and health – related training, to utilize this reporting system as a pre-cursor to filing a
complaint with OSHA.
5.0.12 Incident Recordkeeping Database
SKANSKA/TULLY JV shall maintain a Project OSHA-300 Log (or equivalent database). This shall be
maintained in accordance with 29 CFR 1904 – Recording and Reporting Occupational Injuries and
Illnesses. SKANSKA/TULLY JV also agrees to compile and maintain a database that describes "near
miss" events, and hazards or hazardous conditions that were discovered and corrected during the
safety audits/inspections described in 5.0.10 and 5.1.5 of this Partnership Agreement. Information
in this database will be used as a training tool and made available to all the Contractors.
5.1 Project Contractor's Role
5.1.1 Croton Water Treatment Facility Specific Safety and Health Plan
All contractors shall provide a task specific hazard analysis and a site-specific safety and health
plan, which meets or exceeds SKANSKA/TULLY JV's Project specific plan. If the contractor does not
have their own safety plan they must adopt SKANSKA/TULLY JV's plan.
5.1.2 New Hire Safety Orientation
All contractors shall provide new hire employees with project-specific safety and health information
and instructions prior to starting work.
5.1.3 Task-specific Weekly Toolbox Instructions
All contractors shall provide workers with instructions on integration of safety and health
requirements with current work tasks for the week. All Contractors shall allow an OSHA
representative to attend any of these meetings, when requested by OSHA.
5.1.4 Safety and Health Representation
All Contractors shall assign a Qualified Safety and Health Representative to administer their
program onsite.
5.1.5 Weekly Safety and Health Inspections
All contractors shall be subject to weekly inspections of their portion of the jobsite by
SKANSKA/TULLY JV to assess compliance with all project safety and health requirements and OSHA
standards. No outstanding non-compliance issues shall be allowed to carry over into the subsequent
week's inspections.
5.1.6 Safety and Health Training
All contractors shall provide on-going safety and health training to workers that will address new
project tasks, or processes. Where workers who do not speak English are on-site, training will be
conducted or facilitated in a language that the worker understands.
5.1.7 Recordkeeping/ Documentation
All documentation of safety and health activities described herein shall be recorded and maintained
by SKANSKA/TULLY JV. Documentation of near misses, and the correction of hazardous conditions that
were noticed due to the heightened safety and health awareness that this partnership creates, shall
be completed by SKANSKA/TULLY JV at least quarterly.
5.2 OSHA's Role
5.2.1 Program Evaluation
Provide initial and continued review and evaluation of Skanska/Tully JV's compliance with the
partnership agreement.
5.2.2 Incident Trend Analysis
Provide feedback on incident trends and patterns as needed.
5.2.3 Access to Training Resources
Assist in identifying cost-effective training resources for partnership agreement participants.
5.2.4 Interpretation of OSHA Standards
Clarify the intent of OSHA standards and resolve conflicts of interpretation with assistance from
the Office of Construction Standards and OSHA Compliance Assistance.
5.2.5 Compliance Strategies
Provide input on compliance strategies as proposed by program participants.
5.2.6 Attendance at Safety and Health Meetings
OSHA representatives will periodically attend site safety and health meetings.
5.2.7 New York State Department of Labor 21(d) Consultation Services
The New York State Department of Labor On-Site Consultation Program will provide resources as
necessary and available to support the priority training and technical assistance needs of the
participants of this partnership. Such assistance, which is provided only at the request of the
employer, may be in the form of onsite or off-site safety and/or health consultations. All
consultation findings will be kept confidential, so long as the employers agree to correct any
serious hazards that may be identified. There are no costs to the employer for the assistance
provided by the On-site Consultation Program under this agreement.
5.3 Craft Labor's Role
5.3.1 Safety and Health Field Performance
Meet all project Safety and Health requirements relative to work assignments as a condition of
employment.
5.3.2 Safe Work on Demand
Immediately notify designated site safety and health representatives, or management personnel, of
any work assignment that violates the Project's EH&S requirements.
5.3.3 Monthly Safety and Health Meetings
Attend and participate in monthly meetings that are held by SKANSKA/TULLY JV.
Provide input on safety and health as related to specific trade/skill areas of expertise.
5.3.4 Partnership Representation
Designate representative(s) to provide input in all partnership agreement initiatives.
6.0 Measurement and Evaluation of Performance
6.1 SKANSKA/TULLY JV will compile and track a monthly summary of contractor injury and illness
performance statistics at the job site. This data will be compared to SKANSKA/TULLY JV historical
data, the historical data (if available) of the participating employers, and national data for
comparison and evaluation.
6.2 SKANSKA/TULLY JV will collect documentation from contractors in order to ensure procedural
performance of Project requirements.
6.3 Within 30 days of the initiation of this partnership agreement OSHA and SKANSKA/TULLY JV shall
conduct a verification inspection of the Croton Water Treatment Facility, as defined in Section 2.0:
Definitions, and Section 9.1: Verification Inspections.
6.4 At the end of each quarter, SKANSKA/TULLY JV will compile and submit to OSHA a report that
evaluates the partnership agreement's achievements and identifies areas for continued improvement.
Near misses are an integral part of the accident prevention program and will be evaluated by the
safety and health team. This quarterly report will also include a list of all employees that have
received safety and health training as a result of and during the term of this Partnership
Agreement. The employee's name, employer, and topic and length of training shall be included in this
quarterly report.
7.0 Communication of Results
The signatories or their designated representative(s) will meet at least three times annually to
review partnership agreement status and progress. At least one of the meetings will be in person,
and this meeting will take place at the site safety trailer complex, and may be combined with the
Implementation Team meetings.
The partners will prepare a joint evaluation of the partnership annually. The evaluation will review
the success of the partnership, lessons learned, and changes that will be made to meet the goals of
the partnership. The annual performance evaluation report format from Appendix C of the OSHA
Strategic Partnership Program (OSPP) Directive CSP 03-02-002 will be used. Performance measures
listed in Section 3.0 Partnership Goals and Objectives, of this partnership agreement will be
collected and analyzed to determine the partnership's progress toward meeting its goals.
8.0 Employee Involvement and Employee Rights
This partnership agreement fully supports and recognizes the importance of employee participation in
matters concerning safety and health in the workplace. As a vital component of an effective safety
and health program, the ability of employees to exercise their rights, which are guaranteed under
the OSH Act, will not be infringed. Employee involvement in the worksite safety and health program
will be encouraged, including employee participation in safety and health program reviews, site
inspections, employee safety and health training, accident investigations, and freedom to report
hazards, including near misses. The Building Trade Organizations most directly involved or affected
by this partnership will be consulted and encouraged to suggest improvements and further
enhancements of this partnership. SKANSKA/TULLY JV will document all employee, trade organization,
and union involvement in this Partnership.
9.0 OSHA Inspections and Investigations
9.1 Verification Inspections - Qualification for this OSHA Partnership
requires that OSHA conduct a Verification Inspection of SKANSKA/TULLY JV and the Project within
30 days of the signing of this agreement, and annually thereafter for the
term of this Partnership Agreement. This verification inspection will determine SKANSKA/TULLY JV
and contractor compliance and include a comprehensive review of the effectiveness of each
subcontractor's safety and health program. Subcontractors who are determined, by OSHA, to be outside
the aforementioned criteria for inclusion under this Partnership Agreement will be subject to
traditional OSHA inspections and enforcement actions. Serious hazards discovered during the
Verification Inspection may result in the issuance of citations and penalties. Other than regulatory
violations (e.g., 29CFR 1903 and 1904), no penalties will be assessed for other-than-serious
violations provided they are abated the same day as the inspection.
Enforcement verification inspections are performed in accordance with the applicable sections of the
OSHA FIRM and other enforcement guidance documents. As such, a focused inspection, concentrating on
the project safety and health program/plan, and the four leading hazards in construction: falls,
electrical hazards, caught in/between hazards, and struck by hazards may be done where upon initial
inspection of the site the OSHA compliance officer (CSHO) determines that the contractor meets the
requirements of the Focused Inspection Initiative.
9.2 Formal Complaints / Referrals / Imminent Danger
This partnership calls for the immediate response by SKANSKA/TULLY JV to each allegation of a safety
and health hazard brought to the attention of management by any person. Upon finding that the
allegation is valid, the employer shall promptly correct the hazard.
SKANSKA/TULLY JV and the participating contractors recognize and accept that OSHA will investigate
formal complaints and referrals, and alleged imminent danger hazards in accordance with OSHA's
CPL-02-00-140 – Complaint Policies and Procedures. These inspections will be conducted outside the
scope of this partnership agreement in accordance with normal enforcement procedures and practices.
Hazards identified may result in the issuance of citations and penalties. All formal complaints,
referrals, and imminent danger situations will be discussed by SKANSKA/TULLY JV at the next
scheduled job safety and health meeting.
9.3 Investigations
OSHA will investigate non-formal complaints in accordance with OSHA's CPL-02-00-140 – Complaint
Policies and Procedures. SKANSKA/TULLY JV will immediately investigate all allegations and correct
any hazards identified. The affected subcontractor, if any, as well as affected unions will also be
notified of the alleged hazard. SKANSKA/TULLY JV will notify OSHA of its findings and abatement
within five calendar days of the original complaint notification. Failure
to meet this time frame will place the complaint/referral outside the scope of this partnership
agreement and result in an OSHA on-site inspection of the allegations.
All non-formal complaints and investigation results will be discussed by SKANSKA/TULLY JV at the
next scheduled job safety and health meeting.
9.4 Accident/Incident Inspections
SKANSKA/TULLY JV and the participating contractors recognize and accept that OSHA will fully inspect
incidents involving employee deaths, incidents resulting in the hospitalization of three or more
employees, or other serious incidents that come to the attention of OSHA. These inspections will be
conducted outside the partnership in accordance with normal enforcement procedures and practices.
Hazards identified may result in the issuance of citations and penalties.
9.5 Programmed Inspections
Programmed Inspections may be initiated if there has not been a verification inspection during the
12 previous months. These inspections will be conducted in accordance with normal enforcement
procedures and practices. Hazards identified may result in the issuance of citations and penalties.
SKANSKA/TULLY JV and the contractors participating in this partnership will receive a deferral from
Programmed Inspections, for 12 months, after successful completion of the Verification Inspection.
9.5 Follow-up Inspections
If OSHA issues citations as a result of any inspection conducted, it may conduct a follow-up
inspection to verify abatement.
10.0 Incentives
10.1 Skanska/Tully JV, and the participating contractors will receive a deferral, for 12 months,
from programmed inspections following successful completion of a verification inspection.
10.2 No penalties will be assessed for other-than-serious violations provided they are abated the
same day as the inspection.
10.3 A maximum "Good Faith" and "History" penalty adjustment factor will be applied as allowed under
OSHA's Field Instruction Reference Manual (FIRM) in the event that citations are issued to the
SKANSKA/TULLY JV and the participating contractors.
10.4 OSHA will work with the Partnership participants to maximize recognition of the Partnership
through various media outlets and the OSHA web site.
11.0 Termination of Partnership Agreement
This agreement will expire when Skanska/Tully JV's project activities are completed. Should either
OSHA or SKANSKA/TULLY JV choose to withdraw prior to that date, thirty (30) days written notice will
be given, and the partnership would terminate. If OSHA chooses to withdraw its participation in the
partnership, the entire agreement is terminated. Either party may also propose modification or
amendment of the agreement.
Paperwork Reduction Act Notice
Form Approved
OMB# 1218-0244 Expires 01-31-2009
Public reporting burden for the time needed to develop the Partnership requirements, craft
agreement language,
and conduct an internal review process is estimated to be an average of 11 burden hours per
respondent. |
Appendix
OSHA Strategic Partnership Program
Annual Partnership Evaluation Report
| Goals of Partnership |
| Goal |
Strategy |
Measure |
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| Strategic Management Plan Target
Areas (check one) |
| Construction |
|
Manufacturing Amputations |
|
| Non-Construction |
|
|
|
| Strategic
Management Plan Areas of Emphasis (check all applicable) |
| Amputations in Construction |
|
Oil and Gas Field Services |
|
| Blast Furnaces and Basic Steel Products |
|
Preserve Fruits and Vegetables |
|
| Blood Lead Levels |
|
Public Warehousing and Storage |
|
| Concrete, Gypsum and Plaster Products |
|
Ship/Boat Building and Repair |
|
| Ergo/Musculoskeletal |
|
Silica-Related Disease |
|
| Landscaping/Horticultural Services |
|
|
|
|
Section 1 General Partnership Information |
| Date of Evaluation Report |
|
| Evaluation Period |
| Start Date |
|
End Date |
|
| Evaluation Contact Person |
|
| Originating Office |
|
| Partnership Coverage |
| # Active Employers |
|
# Active Employees |
|
| Industry Coverage (note range or
specific SIC and NAICS for each partner) |
| Partner |
SIC |
NAICS |
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
|
Section 2 Activities Performed |
| Note whether an activity was
required by the OSP and whether it was performed |
| |
Required |
Performed |
| a. Training |
|
|
| b. Consultation Visits |
|
|
| c. Safety and Health Management Systems
Reviewed/Developed |
|
|
| d. Technical Assistance |
|
|
| e. VPP-Focused Activities |
|
|
| f. OSHA Enforcement Inspections |
|
|
| g. Offsite Verifications |
|
|
| h. Onsite Non-Enforcement Interactions |
|
|
| i. Participant Self-Inspections |
|
|
| j. Other Activities |
|
|
| 2a. Training (if performed,
provide the following totals) |
| Training sessions conducted by OSHA staff |
|
| Training sessions conducted by non-OSHA staff |
|
| Employees trained |
|
| Training hours provided to employees |
|
| Supervisors/managers trained |
|
| Training hours provided to supervisors/managers |
|
| Comments/Explanations (briefly
describe activities, or explain if activity required but not performed) |
|
| 2b. Consultation Visits (if
performed, provide the following total) |
| Consultation visits to partner sites |
|
| Comments/Explanations (briefly
describe activities, or explain if activity required but not performed) |
|
| 2c. Safety and Health Management
Systems (if performed, provide the following total) |
| Number of systems implemented or improved using the 1989
Guidelines as a model |
|
| Comments/Explanations (briefly
describe activities, or explain if activity required but not performed) |
|
| 2d. Technical Assistance (if
performed, note type and by whom) |
| |
Provided by OSHA Staff |
Provided by Partners |
Provided by Other Party |
| Conference/Seminar Participation |
|
|
|
| Interpretation/Explanation of Standards or OSHA Policy |
|
|
|
| Abatement Assistance |
|
|
|
| Speeches |
|
|
|
| Other (please specify) |
|
|
|
| Comments/Explanations (briefly
describe activities, or explain if activity required but not performed) |
|
| 2e. VPP-Focused Activities (if
performed, provide the following totals) |
| Partners/participants actively seeking VPP participation |
|
| Applications submitted |
|
| VPP participants |
|
| Comments/Explanations (briefly
describe activities, or explain if activity required but not performed) |
|
| 2f. OSHA Enforcement Activity (if
performed, provide the following totals for any programmed, unprogrammed, and verification-related
inspections) |
| OSHA enforcement inspections conducted |
|
| OSHA enforcement inspections in compliance |
|
| OSHA enforcement inspections with violations cited |
|
| Average number of citations classified as Serious, Repeat, and
Willful |
|
| Comments/Explanations (briefly
describe activities, or explain if activity required but not performed) |
|
| 2g. Offsite Verification (if
performed provide the following total) |
| Offsite verifications performed |
|
| Comments/Explanations (briefly
describe activities, or explain if activity required but not performed) |
|
| 2h. Onsite Non-Enforcement
Verification (if performed provide the following total) |
| Onsite non-enforcement verifications performed |
|
| Comments/Explanations (briefly
describe activities, or explain if activity required but not performed) |
|
| 2i. Participant Self-Inspections
(if performed provide the following totals) |
| Self-inspections performed |
|
| Hazards and/or violations identified and corrected/abated |
|
| Comments/Explanations (briefly
describe activities, or explain if activity required but not performed) |
|
| 2j. Other Activities (briefly describe other
activities performed) |
|
|
Section 3 Illness and Injury Information* |
| Year |
Hours |
Total Cases |
TCIR |
# of Days Away from Work Restricted and
Transferred Activity Cases |
DART |
| 2005 |
|
|
|
|
|
| 2006 |
|
|
|
|
|
| 2007 |
|
|
|
|
|
| Total |
|
|
|
|
|
| Three-Year Rate (2000-2001) |
|
|
|
|
BLS National Average for 2001 |
|
|
|
| Baseline |
|
|
|
|
|
*Sample Chart – not required format
|
Section 4 Partnership Plans, Benefits, and Recommendations |
| Changes and Challenges
(check all applicable) |
| |
Changes |
Challenges |
| Management Structure |
|
|
| Participants |
|
|
| Data Collection |
|
|
| Employee Involvement |
|
|
| OSHA Enforcement Inspections |
|
|
| Partnership Outreach |
|
|
| Training |
|
|
| Other (specify) |
|
|
| Comments |
|
| Plans to Improve
(check all applicable) |
| |
Improvements |
N/A |
| Meet more often |
|
|
| Improve data collection |
|
|
| Conduct more training |
|
|
| Change goals |
|
|
| Comments |
|
| Partnership Benefits (check all
applicable) |
| Increased safety and health awareness |
|
| Improved relationship with OSHA |
|
| Improved relationship with employers |
|
| Improved relationship with employees or unions |
|
| Increased number of participants |
|
| Other (specify) |
|
| Comments |
|
| Status Recommendation
cCheck one) |
| Partnership Completed |
|
| Continue/Renew |
|
| Continue with the following provisions: |
|
|
| Terminate (provide explanation) |
|
|
Signed this xth day of August, 2008:
Louis Ricca
Acting Region 2 Regional Administrator
USDOL/OSHA |
Date |
Ali M. Catik
Vice President Operations
Skanska/Tully JV |
Date |
Diana Cortez
Area Director, Tarrytown Area Office
USDOL/OSHA |
Date |
James Rush
Program Manager
NYS Department of Labor
Onsite Consultation Program |
Date |
Chris Ward
General Manager
General Contractors Association of New York, Inc. |
Date |
|
|
|
|
|