Back to Interlinked Information on State Plan Standards and Policies/Directives
Federal Program Change Summary Report
Clarification of OSHA's Enforcement Policies Relating to Floors/Nets and Shear Connectors
| Federal Directive Number: |
CPL-02-01-048 |
| Date of Directive: |
4/30/2010 |
| |
|
| The purpose of this Instruction is to clarify OSHA's enforcement policy on the requirements regarding: (1) fully planked or decked floors or nets, which was announced in Question and Answer #23 in OSHA Instruction CPL 02-01-034 (formerly CPL 2-1.34), issued March 22, 2002, and (2) the use of pre-installed shear connectors during steel erection, which was announced in Question and Answer #25 in OSHA Instruction CPL 02-01-034 (formerly CPL 2-1.34), issued March 22, 2002. This Instruction rescinds Questions 23 and 25. |
| |
| Equivalency Required |
Intention Required |
|
| |
|
* Plan covers State and local government employees only.
[Last updated: April 14, 2011]
Accessibility Assistance: Contact the OSHA Directorate of Cooperative and State Programs at
202-693-2200 for assistance accessing PDF materials.
|