|
ELEMENT
|
GOAL(S)
|
MEASUREMENTS
|
|
1. Exposure Assessment
|
To establish a database that allows assessment of exposure
conditions, trends and specific controls. |
-
Format and categorize by
product and task pre-1990 exposure measurements (3-5,000
samples). Implementation year 2 (2001).
-
Format and categorize by
product and task post – 1990 exposure measurements
(1-2,000 samples). Implementation year 2 (2001).
-
Format and categorize by
product and task exposure measurements available in the
literature or from other organizations. Implementation year
2 (2001) and 3 (2002).
- Develop a sampling strategy
designed to target higher potential exposures such as: loose
fill installation; removal activities combined with
demolition activity; tightly enclosed, poorly ventilated
space applications; fabrication with hand-held power cutting
tools, such as saws; compressed air cleanup; mineral wool
manufacturing; mineral wool ceiling tile installation;
special application fibers; batt insulation installation;
and removal of unjacketed high temperature insulation
exposed to service temperature of above 177° C/350° F.
Implementation year 2 (2001) with sampling beginning year 3
(2002).
- Develop a sampling strategy
designed to verify exposures during manufacture fabrication,
or use of products with traditionally low potential
exposures and to assess exposure levels of new products.
Implementation year 3 (2002) with sampling beginning year 2
(2001)
- Develop procedures to
ensure database integrity and that the database includes
sufficient data to access current exposures by collecting
approximately 400 samples annually. Implementation year 3
(2002) and continuing through compliance year 5 (2007).
|
|
2. Quality Assurance
|
To provide independent validation of exposure assessments.
|
- An auditing team will be
established to validate exposure assessments. Implementation
year 2 (2001).
|
|
3. Training |
To develop educational material and provide information
regarding potential hazards, appropriate work-practices, and
exposure controls. |
The following information will be provided to OSHA on an
annual basis starting Implementation year 3 (2002) and
continuing through Compliance year 5 (2007):
- Number of training sessions
conducted
- Number of "trainers"
trained
- Number of people present at
training seminars
- Number of videos, brochures
or other material distributed
- NAIMA also commits to complete one "Train the
Trainer" session that will train 10 trainers within the
first 24 months of the implementation phase of the HSPP. In
addition, during that same 24-month time period, NAIMA
commits to 10 geographically diverse worker-training
sessions. NAIMA also commits to conduct an additional 20
worker-training sessions within the first 36 months of the
implementation phase of the HSPP.
|
|
4. User Intervention and Customer Service |
To determine best work practices, and promote continuous
improvement in appropriate handling and use of insulation
products through employee and customer involvement. |
The following information will be provided to OSHA on an
annual basis starting Implementation year 3 (2002) and
continuing through Compliance year 5 (2007):
- Narrative reports on the
most effective control measures and work-practices.
- Facilitate documentation of
user work-practices using questionnaires.
- Number of individuals or
companies requesting on-site intervention.
- Add Partnership Program and
accompanying brochures to NAIMA’s website and track number
of hits. Implementation year 2 (2001).
- Manufacturing companies with established seminars or
training courses taught by certified industrial
hygienists will invite by letter SVF users/customers to
attend these seminars and training courses. Where
possible, these manufacturing companies will provide
NAIMA with the number of users/customers attending the
training courses.
- NAIMA will identify respirator manufacturers and
distributors that provide free respirator fit testing
and training, and NAIMA will then provide the names of
those manufacturers and distributors to employers and
workers handling SVF products. The list of manufacturers
and leading distributors will appear on NAIMA’s web
site and in NAIMA’s literature promoting the Health
and Safety Partnership Program. NAIMA will categorize
these manufacturers and distributors by region.
- NAIMA members with 1- 800 numbers that supply health and
safety information to employees and other workers
exposed to SVFs will provide NAIMA with an approximate
number, when available, of worker safety information
inquiries per year. In turn, NAIMA will forward this
information to OSHA, without identifying the companies
providing the data, in the annual report to be submitted
by NAIMA.
- NAIMA and its members companies will circulate annually
a questionnaire that asks manufacturing workers and
manufacturers’ customers to indicate the safe work
practices they employ on a regular basis. NAIMA will
provide a summary of these questionnaire results in the
annual report submitted to OSHA.
- Where SVF insulation products are sold by large,
nationwide, retail outlets from which contractors may
purchase SVF products, NAIMA and its members companies
will provide, where feasible and appropriate, workers
safety information.
|
|
5. Governmental Partnership |
To provide periodic briefings to OSHA and other interested
Parties. |
Number of sessions and content will be mutually determined. |
|
6. Research |
To continue a program of basic and applied research on new
product formulations or where data are deemed insufficient to
determine potential risks, or effective controls. |
- Manufacturers with medical monitoring programs will
provide annual reports to NAIMA on their programs. NAIMA
will provide OSHA with this information in its annual
reports to the Agency.
- NAIMA will conduct studies with respirator manufacturers
to measure the efficacy of various respiratory
protection devices (specifically the N95 series) in
limiting potential exposure to SVFs.
- Validate protocols to
assure appropriate bio-solubility of insulation products.
Implementation years 1 (2000), 2 (2001) and 3 (2002).
- Identify independent
laboratories for conducting quality assurance testing for
insulation products. Implementation year 3 (2002) and
throughout Compliance years 1-5 (2003 –2007).
|