skip navigational links Occupational Safety & Health Administration DOL.gov OSHA.gov DOL.gov
www.OSHA.gov
<<< Back to Armour Swift-Eckrich PSM Presentation


Link to Printing InstructionsPrinting Instructions | Text Version
 
HOME
Slides 1-10
Slides 11-20 Slide 21
Slide 22
Slide 23
Slide 24
Slide 25
Slide 26
Slide 27
Slide 28
Slide 29
Slide 30
Slides 31-40
Slides 41-46
Slide 27

    TEXT VERSION OF SLIDE:

    Title: Process Safety Information
    Type: Text Slide
    Content:
    • The facilities PSI Information did not include:
      • Verification of good engineering practices in ammonia system including
        1. Location of the discharge of pressure relief valves (PRVs) for new system
        2. The size of common vent header for PRVs
        3. Suitability of pipe and vessel insulation materials
        4. Installation of PRVs on appropriate devices (#'s 3 and 25 accumulators)
        5. Location of king valves (not operable from floor and no access platform)

Back to Top Back to Top www.osha.gov www.dol.gov

Contact Us | Freedom of Information Act | Customer Survey
Privacy and Security Statement | Disclaimers
Occupational Safety & Health Administration
200 Constitution Avenue, NW
Washington, DC 20210