OSHA Documents

Documents requested from OSHA Inspection of Kansas City, KS
  1. EPA Reportable Release Forms/Form ‘R’ 23
  2. Operator Log Book (Operator Log/System Log)
  3. PSM Committee Meeting Minutes (PSM Team Minutes) and responses made to resolve issues.
  4. Mechanical Integrity audits for past two years and actions taken in response to audit. {Removed from list as duplicate of 32}
  5. Minutes of PSM Consultations with hourly employee for past two years and responses to consultation.
  6. Written PSM Program (all 13 elements)
  7. List of employee safety concerns/responses
  8. Access to PSM file cabinet
  9. PSM Compliance Status Reports/memos/letters/or interplant documents from 1992 (and responses)
  10. Any action plans for compliance with PSM standard from 1992
  11. Safety Committee and/or supervisor safety audits (checklists/forms) and responses to the audits
  12. Operating procedures for Emergency Shutdown/operations (?) for both systems/Start-ups following and emergency shutdown
  13. Line breaking procedures for both systems and employee training records
  14. Lockout/tagout procedures for all equipment in both systems (machine specific procedures and general program) and employee training records
  15. Confined Space entry procedures and employee training records (and program)
  16. Site control for contractors/maintenance personnel
  17. Hazwoper (HAZMAT) procedures/programs/training programs and records/agreements with outside responders/medical exams for responders/physician opinions/incident critiques/list of responses for last two years
  18. PPE Programs (1910.132) written evaluations and inspections; 1910.134 respiratory programs and employee training records
  19. HazCom program/training records
  20. Emergency Action Plans
  21. Meeting notes of meeting which occurred approximately last Thursday (4-24-97) with Luicille White, John Lewis, Paul Williams, and Robbie Robison)
  22. Emergency Alarm/signal procedures/programs/test records
  23. Annual certification of operating procedures
  24. PSM Operating procedures (including emergency shutdown); training records (and means to assure OJT and classroom training was effective)
  25. Training programs for operators for new and old systems
  26. Contractor injury and illness logs
  27. List of outside contractors used for the past two years and what jobs they performed
  28. Contractor training and information programs; and training records
  29. Contractor safety and health program evaluation criteria/procedures/program - name of person(s) performing these evaluations
  30. Written mechanical integrity program procedures. ie. For compressors/pumps/calibration of alarms/level indicators/controls;cut-off’s/pipes/valves/pressure reliefs/vents/cut off switches/interlocks/etc.
  31. Testing procedures for mechanical equipment/Inspection procedures for mechanical equipment
  32. Documentation of inspection/tests performed on process equipment and frequency performed
  33. Training documentation for personnel who perform process equipment inspection and testing.
  34. Accident Investigation Reports
  35. Route cause analysis training program and training documentation
  36. Resolution of incident investigation finding and recommendations as (?)
     
    1. Incident dated 07-17-97
    2. Incident dated 02-27-97
    3. Incident dated 02-13-97
    4. Incident dated 09-15-96
    5. Incident dated 02-04-97
  37. Compliance Audits (need reference documents used to compile findings)
  38. Resolution of recommendations made in the Preston Refrigeration Report of 01-24-97

LIST # 2

(I) Pre-Start Up Safety Review
  1. Documents generated during Pre-start up safety review for new sausage line in 1996 including the following:
    1. Checklist demonstrating that installed equipment in accordance with design specifications. A construction inspection report or punch list from engineer-of-record would suffice
    2. Documents to show that SOP’s, maintenance and emergency procedures were in place, prior to charging system with ammonia.
    3. Provide PHA for new ammonia system put on line in 1996
    4. Was training performed for operators in engine room prior to start-up? Any documents to show this.
    • Refrigeration Inspection by Dual Temp.
    (d) Process Safety Information
    1. Information pertaining to hazard such as toxicity, PEL, reactivity, corrosivity. MSDS has some of this info.
    2. P&ID’s for old and new machine room. These diagrams should include "state points" of process such as design pressure and temperature in different components of system.
    3. Maximum intended inventory of ammonia. Charge into system (pounds of ammonia).
    4. Provide specifications used to purchase ammonia. What is grade or quality of ammonia? Do you specify issue of "contaminants" picked up during transport.
    5. Safe operating limits (high and low) for temperatures, pressures, flow rates of ammonia and critical auxiliary system such as evaporative condensers. Ammonia levels in Receiver?
    6. Simplified block flow diagrams
    7. Plan view of plant showing electrical classification of each area per NEC/NFPA
    8. Ammonia relief system design and design basis. Include design and manifold that connects discharge from each relief valve.
    9. Basis of design for ventilation system in machine room.
    10. For old and new system design what were applicable:
      1. building codes?
      2. mechanical codes?
      3. industry standards of recommended practice
    11. Descriptive of safety systems including equipment to prevent:
      1. thermal expansion from trapped liquid
      2. liquid deceleration (hydraulic shock or hammer)
      3. vapor-propelled liquid (hydraulic shock or hammer)
    12. Description of safety interlock
    13. Description of detection system
    14. Description of suppression systems such as water fogs, mists, etc.
    15. Provide design/specification sheets for pressure vessels, shop drawings of pressure vessels would be sufficient.
    16. Provide any documentation that system meets good engineering practice as established by IIAR, ASHREA, etc.
    (e) Process Hazard Analysis
    1. Audit indicates PHA’s were performed without adequate PSI. Have these audits been redone?
    2. Is there a PHA for new 1996 ammonia system.
    3. Did PHA’s address hazards by work category? Different for maintenance workers o pumps, reliefs than packing operators?
    4. Did PHA’s consider previous incidents. Could not find PHA analysis. Did you consider incidents reported in industry literature such as lift trucks hitting piping, etc.
    5. Did PHA’s consider interrelationship of detection system and ventilation engineering controls?
    6. What factors were considered for siting of machine room and machine room offices in the event of a leak?
    7. What human factors were considered for machine room controls, alarms, access. (Primatech has this now)
(I) Management of Change

Was MOC done for evaporative condenser tube bundle replacement two years ago?




Document request - 04/30/97
  • Copy of all PSM committee minutes
  • Turn around reports or major repair and inspections
  • For contractors repairing/replacing insulation:
    • inspection reports on piping condition
    • training
    • names of workers repairing insulation
  • Work orders for pipe replacement since January 1996 and design criteria for piping and insulation.
  • MOC for condenser changed out two years ago that failed this week.
  • Pages 307-395 from operator logs
  • Operator walk around mechanical integrity audits for last two months
  • Corporate guidelines for all SOP’s
    • Attachment to PSI
  • Mechanical integrity documents including:
    • design specification sheets
    • maintenance records and procedures
    • inspection and test procedures and records
  • Pressure vessels and tanks:
    • 35 pound accumulator
    • 75 pound receiver
    • Transfer tank
    • - Heat exchanger
  • Piping spools - corporate T&I or pipe submitted
    • Hot Gas Return lines
    • Hi Temp liquid lines
    • Hot gas lines
    • Relief valve headers
  • Instruments:
    • Level indicators for accumulators
    • Evap xcy (?) switch for isolation
    • Emergency stop button
    • Compressor low pressure cut out
    • Compressor high pressure and temperature cut out
    • High 25 pound accumulator cut out (04/30/97) ie Stop
  • Relief device histories:
    • # 1, # 2, # 8 FES compressors
    • # 3 High side dump
    • # 35, # 75 pound receivers (REC HI-A; REC Lo-A)
    • Intercooler ICIA
    • Oil Accum OCA-12-94
    • Transfer tank TTA
    • # 3 Accumulator (OP 5:1-94)
    • # 3 low side dump LD3A
  • Valves
    • Valves on following lines:
    • hot gas
    • hot gas return
    • hi temp liquid lines
    • pump out valves all old valves
    • S4A RS
    • Ammonia shut off valves (isolation valves)
    • Transfer tank valves
  • Pumps
    • Ammonia pumps
    • Compressors # 1, # 2, # 8
  • SOP’s for new system
  • MOC for change of egress

 
Back to Top Back to Top www.osha.gov www.dol.gov

Contact Us | Freedom of Information Act | Customer Survey
Privacy and Security Statement | Disclaimers
Occupational Safety & Health Administration
200 Constitution Avenue, NW
Washington, DC 20210